Original source · versioned page text
2014-03-25 Planning & Organisation Committee Agenda Pages 15-38
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
Page 32 of 231
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 M
ARCH 2014
requirements of the Main Koags bepartment.
C22) Bltumen surtacing of O.5 Kilometres
ot Carriageway past Saney farm.
(111) Upgrace the EXISLINGa timber bricge
within Sheppersons Lane.
(iv) W1IGEN and uparade SPPproximately ons
(1) Kitometre ot Sneppersons Lane,
comprising the baiance area ot gravel
Pavement, to the acomee POlnt to the Site.
The design ot the ADOVE Works shall be
Prepared by a Registered Civil Engineer
and shal! be submitted to the Shire
Engineer tor @pproval prior to
commencemsnt ot construction. The
Registered Civil Engineer shat certity
that the works have been constructed in
accordance with tne approved plans.
|
In lieu of the above works, Council may
accept a contribution of $150,000.00 with
the works then to be carried out by
Council." .
| |
and substituting theretor the following |
condition:
. "1. The applicant shall carry out the
Lo we. ddatte jeeps ore wane cexter nal roadworks to the
£1 RREGRRIENS sets Book Stet pon ie uiigeuas oN Sea Sree as, 2.
a Me ora
Rae
Page 32 of 231See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.