PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
Page 33 of 231
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
Sheerersens Lane anc KIN KIN Road to the
reguireamants ot the Main Hosds bepartment
to which the Councis wilt contribute the
sum of $4,000, UU:
; (12) Upgrading on the EXISTING tamber
. DridgS within Sneppersons Lané following
Completion ot an tnaineer’s Investigation
to a Standard required tor quarry
generated trattic; .
(122) Widen ana Upgrade Sheppersons Lane
trom the intersection With Kin Kin Road to
the access point te the Site using
selected gravel till or material approvea
By the Shire iEngineer Trom tne quarry
site;
(iv) All the above works to be completed
Prior toe tne guarry commencing operations,
. The design of the above works shali be
prepared by a registered Civil Engineer
and shall be supmitted to the Shire
Engineer tor 4pproval prior to |
>) :
> commencement of construction. The
‘. } registered Civil Engineer shail certity
a” that the works have been constructed in
accordance with the approved plans.
B. By deleting condition 4 thereot.
c. By deleting from condition 10 thereot the
Page 33 of 231See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.