Original source · versioned page text
2014-03-25 Planning & Organisation Committee Agenda Pages 15-38
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
4. The Environmental Management Plan shall incorporate the requirement for annual
environmental compliance monitoring and annual audit reports to be submitted to
Council for the operation of the development. The format and content of these
reports shall demonstrate compliance with the Management Plan and Consent Order
and include a written discussion of the results and recommend any necessary
actions.
5. An Environmental Management Plan (EMP) shall be prepared and implemented to
ensure that the impact of the development on the environment is minimised and that
the environmental values of the site are protected and enhanced. The Environmental
Management Plan is to address the implementation of the requirements of the
ecological restoration plan, sediment and erosion control plan, water quality
management plan, landscape master plan; and address all other environmental
considerations deemed relevant to the approved use and local environment, in order
to minimize environmental harm and provide for progressive self-sustainable
landscape/ecosystem re-habilitation. The EMP should be prepared to a standard
necessary to meet Council requirements and recognized industry standards. The
EMP is to:
Comply with AS00014.
Demonstrate a high level of environmental care and responsibility and be
consistent with best practice for developments of this type in similar
environments.
Detail the applicant’s environmental policy and the proposed environmental
management system for the site.
6. The Environmental Management Plan shall specify to the reasonable satisfaction of
Council: the performance targets, including those derived from the conditions and
other requirements arising from legislation;
how the performance targets are to be achieved;
when the performance targets will be satisfied;
how performance will be monitored;
corrective actions and contingency measures to be undertaken;
reporting arrangements ;
auditing arrangements.
7. An Ecological Restoration Plan and Specifications shall be prepared by a specialist
restoration ecologist, to the reasonable satisfaction of the Council. It shall identify all
the areas that require ecological restoration and specify actions and works necessary
to result in robust, self-sustaining viable plant communities and habitat.
8. The applicant/owner of the site shall comply with the updated Management Plan
incorporating the Environmental Management Plan.
9. Detailed staged Sediment and Erosion Control Plans shall be prepared for the site, to
the reasonable satisfaction of Council, and in accordance with the Institution of
Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment
Control’ (June 1996) and in particular using Checklist No. 3 from that document. The
Sediment and Erosion Control Plans shall cover all development on site, ecological
restoration and remediation works.
B. Advise the applicant that the use is to comply with the scale and intensity allowed in the
current approval and any increase in scale and intensity of operations on the site will be
the subject of a further application for Material Change of Use.
Page 22 of 231
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.