Council archive · source document
132006.268.03 - Original Court Approval - Attachment 1
(ii) (iii) (iv) (v) (vi) (vii) (viii) * Annual monitoring shall be undertaken from the time of commissioning to determine the quality of the wastewater produced from the effluent treatment system; * Monitoring of the soils, vegetation and groundwater in the application area shall be undertaken every three years to establish that such is not percolating into the groundwater; * Sampling and testing shall be in accordance with relevant regulatory requirements and manuals such as those provided by the Environmental Protection Agency, with testing undertaken by an accredited Laboratory; * Continuous monitoring shall be undertaken by the system for any water on the surface of the application area, downslope resurfacing, changing plant growth on or around the application area and any other signs of problems, and addressed through maintenance or servicing. A reserve disposal area 100% the size of the primary disposal area shall be nominated and located outside required buffer areas. The location shal! be provided as part of the detailed design report at the Operational Works application stage. A minimum of secondary standard effluent treatment with disinfection to achieve the required microbiological quality (ie. 200 cfu/100 mL with no sample over 1000 cfu/100mL) shall be adopted. Detailed MEDLI modelling shall be undertaken at the operational Works application stage to confirm the appropriate size for the effluent disposal area to ensure this is equal to plant uptake, soil storage and environmentally acceptable release rates. More information on the source/s and respective volumes of wastewater produced during bottling etc shall be provided in a detailed site-based stormwater management plan (SBSWMP) at the Operational Works application stage, including monitoring of actual wastewater production rates. Washing plant, equipment or vehicles shall be undertaken off-site. If on-site washing of any plant or equipment is necessary, all wastewater shall be collected in a sump and disposed of off-site as trade waste by a registered operator. Additional monitoring of wastewater discharge at Outflow Point 1 (G & S$ drawing H J0085.1.7) is to be carried out to demonstrate compliance with the desired SVSWMP water quality objectives in support of an operational Works approval, and on an on-going basis to demonstrate continued compliance with SBSVWMP water quality objectives. This monitoring and assessment of the impact must be carried out compliance with the Ecoaccess operational policy “Wastewater Discharge to Queensland Waters’. Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan (Open Space-Conservation & Waterway Protection) is to be undertaken in addition to replanting as detailed in Drawing H J0085.1.2 of the Conceptual Site-Based Stormwater Management Plan. 40f8 month,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Original Court Approval - Attachment 1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.