Council archive · source document
132006.268.03 - Original Court Approval - Attachment 1
“ a © oe ee ee SE vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any step or level difference. Should any driveways be constructed to grades that do not comply with AS/NZS 2890.1-2004 and AS 2890.2-2002, Council will require that the driveway be removed and reconstructed to levels that do comply. 10. All vehicles shail enter and leave the site in a forward direction. Loading Areas 11. Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site generally as shown on drawing number SK-01, dated 2 August 2010and shail comply with the requirements of AS 2890.2-2002 where applicable. Car Parking 12. A sealed car parking area shall be provided on site generally as shown on drawing number SK-01, dated 2 August 2010 and shall comply with the requirements of AS/NZS 2890.1-2004 where applicable. 13. A minimum of 25 uncovered carpark spaces shall be provided on site, including 1 clearly defined disabled carpark space. 14. All carparking shall be kept, maintained and tine-marked in a condition fit for use. Roadworks Contributions 15. Accontribution of $5,960 shall be paid to the Council towards the cost of improvements to the major road network of Cooroy, as a result of increase traffic generation caused by the proposed development. The contribution shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2007 until the date of payment. 16. Acontribution of $160,975 shall be paid to the Council towards the cost of improvements to Cooroy Mountain Road, as a result of increase traffic generation caused by the proposed development. The contribution shall be paid to the Council prior to obtaining a Development Permit for Operational Works. This amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from December 2007 until the date of payment. Water Quality 17. The applicant shall submit a Water Management Plan for Council approval prior to the issue of any Operational Works Permit. The Water Management Plan shall be prepared by a suitably qualified Environmental Engineer and certified by a Registered Professional Engineer of Queensland. The Water Management Plan shail detail water quantity and quality requirements of environments receiving runoff from the site. The Water Management Plan shall demonstrate that appropriate treatment measures will be incorporated into the proposed use to ensure the existing water quantity and water quality within environments receiving runoff from all aspects of the proposed use (i.e. including but not limited to effluent, carpark runoff and any by products of industrial use occurring on site) are maintained in accordance with The Noosa Plan and the Environmental Protection (Water) Policy 1997. Effluent Disposal 18. -. 18A. The design and construction of the on-site effluent disposal system and disposal area shall be in accordance with the Conceptual Effiuent Treatment and Disposal Strategy prepared by Gilbert and Sutherland, dated Geteber Eo: subject to the following requirements: Bonen Be & (i) ongoing monitoring of treatment process and disposal areas shall be undertaken to ensure both are functioning effectively over time. They shall be undertaken generally as follows: . 3of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132006.268.03 - Original Court Approval - Attachment 1.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.