The classification has been calculated from test work performed on the soil profile encountered on the
day of our fieldwork and consideration .of AS2870-1996. The ‘P’ Classification relates to the loose sands
encountered in the upper profile of our test sites. Any disturbance of the soil profile, may result in a
change to the classification. The attached design, has allowed for the influence of the earthworks
described in section 5.0 below.
3.0 SITE DESCRIPTION:
; The construction area has a gradient in the order of 4%.
Vegetation on the construction area (and nearby surrounds) consists of grasses and scattered trees.
The existing surface drainage is fair and sub-surface drainage is good.
4.0 FINDINGS:
The soil profiles encountered are shown on the attached log sections.
No water table was encountered during our testing program.
The sandy soils encountered are susceptible to collapse when unconfined. This may effect excavations
and result in additional earthworks and increased concrete volumes. For further information please refer
to the attached critical line diagram.
The samples classified on site were assessed as having low to negligible plasticity, therefore laboratory
testing was considered unnecessary.
We have assessed the expected differential movement of the soil profiles encountered to be the
equivalent of a site with a Ys of less than 20mm.
For buildings within the scope of AS 2870-1996, safe bearing is available at 300mm into the MEDIUM
DENSE SAND. This strata is shown shaded on the attached logs
‘ 5.0 SITE PREPARATION DETAILS:
We recommend scraping this site free of all organic material and debris, then cutting the construction
area to form a level pad. There must be no fill placed beneath the foot-print of the building. The
’ prepared construction pad must be entirely on cut natural ground. A small surface spoon drain with a
suitable outflow should be excavated at the base of the cut. Any fill placed outside the foot-print should be
clean material from the cut, laid out in 150mm (maximum) layers and tracked rolled with the excavator
(six passes in each direction). Cut batters of 1 to 2 (vertical to horizontal) and fill batters of 1 to 3 will be
stable providing ail fill is compacted as above and exposed banks are protected against erosion.
Where a retaining wall is required, a cut batter of 1 to 2 (vertical to horizontal) in the sand profile taken
from the base of the proposed walt should be excavated. These earthworks must incorporate shallow
surface spoon drains at the base and along the high side of the cut. Drains must have an efficient outflow
down-slope and clear of the construction area. The exposed face should also be protected against the
potential for stormwater erosion. Should these recommendations be un-achievable the builder should -
seek guidance from this office on temporary shoring, benching or other suitable techniques.
Areas where existing structures or trees are removed shail be backfilled with engineer approved fill
materia! compacted in accordance with AS2870-1996, or alternative measures to be provided by the
engineer.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015CE08.001.pdfRelated documentPublic source context ↗
06/1101 - Application for Op Works 18 Weyba St [As Published]Related documentApplication case desk ↗
About this file
- File size
- 702 KB (small file)
- File type
No other editions are linked here.