Any loose or soft material uncovered in the site preparation shall be removed and replaced with approved
fill material compacted in accordance with AS2870-1996, or alternative measures to be provided by the
engineer.
Site drainage during construction is important. Stormwater run-off should be diverted away from any
foundation excavations and not be able to pond within 5.0m of the building footprint. Temporary spoon
drains or other practical methods should be used.
We recommend using a footing system as per the attached plans and details on the prepared
construction pad.
Where site drainage and landscaping does not conform to the specifications of AS 2870-1996 and CSIRO
information Service Sheet BTF 18 (2003) significant damage to the building can be expected. A single
copy of this document is issued with the original issue of this report. Please consult your builder or
contact this office to obtain a copy.
6.0 FOOTING AND SLAB SPECIFICATIONS:
Footing Details: .
Alt footings must be founded a minimum of 300mm into MEDIUM DENSE SAND (shaded on the attached
log sections). Dimensions and reinforcement requirements are detailed in the following footing plan and
cross-sections.
Where the founding tevel is deep or is covered by the introduction of fill the footings are to be increased in
depth to reach the level. Alternatively the footings can be supported on backhoe dug or drilled piers
founded at or below the founding level. Refer to this office for details.
Drilled Piers Supporting the Footings: ,
Where the MEDIUM DENSE SAND is deep or to be covered by fill the footings can be supported on
350mm diameter drilted piers founded at a minimum of 300mm into the MEDIUM DENSE SAND.
Aiternatively the footings can be founded on steel screw piers. The piers are to be designed and installed
by a specialist contractor to achieve the loads nominated on the structural plans.
Drilled Piers Supporting the Slab:
. Slab piers are required where there is more than 300mm of uncontrolled fill beneath the slab. They are to
be founded at a minimum of 300mm into the MEDIUM DENSE SAND. Special attention must be paid to
the extra thickening and reinforcement required over each pier as detailed in the attached plan and
details. ;
Where drilled piers supporting columns or posts are not poured with the slab they must be connected to
the slab in the following manner:
« 4x N12 bars must be anchored 500mm into the drilled pier and be bent 300mm horizontally into the
footing or slab as required.
¢ Where a column penetrates a beam or footing 3x N12 bars must be bent around the column to lap the
trench mesh by 500mm both sides.
SCG CONSULTING ENGINEERS 3 SCG Ref: 16078(S)See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015CE08.001.pdfRelated documentPublic source context ↗
06/1101 - Application for Op Works 18 Weyba St [As Published]Related documentApplication case desk ↗
About this file
- File size
- 702 KB (small file)
- File type
No other editions are linked here.