2021-11-18 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 18 NOVEMBER 2021
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
DW02 Site Plan 01/09/2020
DW03 Floor Plan 01/09/2020
DW06 Floor Plan Storage Layout 01/09/2020
DW11 Hire Boat Placement Plan 21/09/2021
Perspective 1 21/07/2021
Perspective 2 21/07/2021
Perspective 3 21/07/2021
3. The building and structure must be finished with colours and textures that blend with and
complement the natural setting through low reflective surfaces and timbers that can fade
to grey. The proposed finishes shall be in accordance with perspectives 1, 2 and 3 or as
otherwise agreed in writing by Council.
Operational Management Plan
4. All vessels must be stored/docked within the lease area with all associated equipment
(i.e. life jackets, paddles etc.) stored within the building.
5. The maximum number of vessels stored, available for hire/use must not exceed the
following at any time:
5.1. 16 Boats
5.2. 9 Jet Skis
5.3. 9 Kayaks
5.4. 4 Stand up paddle boards
5.5. 1 Paddle boat
The vessel types and sizes must be as identified on Drawing No. DW 11, titled Hire Boat
Placement Plan prepared by Hayley Deans Designs, unless otherwise agreed in writing
by Council.
6. All boats and jet skis must be embarked and disembarked from the landing or the
foreshore within the lease area with all kayaks, stand up paddle boards and the paddle
boat embarked and disembarked from the foreshore within the lease area.
7. All initial safety/instructional briefings must be conducted fully within the lease area. No
briefings are permitted on the foreshore area outside the lease area.
8. All customers hiring/using vessels must be briefed prior to embarking on where to return
and disembark their vessel from within the lease area.
9. Any vessel and associated equipment for vessels (i.e. life jackets, paddles etc) returned
outside the lease area must be relocated to the designated storage area within the lease
area promptly by staff. Staff must regularly conduct an inspection of the foreshore areas
to ensure all vessels and associated equipment are stored in the designated storage
areas within the lease area.
10. Boat repair activities other than minor repairs such as replacing a battery are not
permitted within the lease area.
11. Wastewater and sullage must only be disposed of at approved pumpout facilities.
12. The building and associated landing must not be utilised for live-aboard purposes.
Currency Period
13. This development approval lapses if the use has not happened by 18 November 2027,
unless an application to extend the currency period is approved by Council.
Performance Bond
Page 6 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.