Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2021-11-18 Ordinary Meeting Minutes

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES                                                     18 NOVEMBER 2021


    14.   Security in the form of a cash bond or trading bank guarantee to the sum of $15,000
          must be submitted to Council, to secure performance of all conditions of this approval,
          prior to the issue of a Development Permit for Building Works. The cash bond or trading
          bank guarantee will be returned on performance of the conditions of approval less any
          costs incurred by Council in respect of enforcing performance of this permit. Council
          reserves the right to call upon the bond or guaranteed sum to effect compliance with
          conditions. The bond shall be released after 12 months from the date the use
          commences. The applicant must notify Council in writing of the date the use
          commences.
          General Requirements
    15.   There must be no electrical reticulation system carrying electricity in excess of 24 volts
          beyond the revetment wall unless all switches and power outlets are positioned above
          the 1%AEP flood level.
    16.   Lighting associated with the use must be designed, installed, operated, and maintained
          in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor
          Lighting.
    17.   Any construction and post construction activity must not impact on the condition of the
          waterway, and must be conducted so as not to breach the Environmental Protection Act
          EPA (1994) and the Environmental Protection (Water) Policy 2009.
    18.   After completion, the proposed works must be maintained in a sound state of repair in
          accordance with the approved plans.




                                                                                    Page 7 of 31
Log in to download the original file

2021-11-18 Ordinary Meeting Minutes(PDF, 888KB).pdf · 909 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.