2022-07-18 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 18 JULY 2022
where there is conflict between the approved plans and conditions of approval,
the condition prevails.
Plan No. Rev. Plan/Document Name Date
188-002-002-B B General Notes prepared by Bax Engineering 7 February 2022
188- 002-100 B Site Layout Plan prepared by Bax Engineering 7 February 2022
188-002-200 B Earthworks Layout Plan prepared by Bax 7 February 2022
Engineering
188-002-201 B Earthworks Sections prepared by Bax 7 February 2022
Engineering
188-002-300 B Grading & Drainage Layout Plan (as annotated 7 February 2022
by Council) prepared by Bax Engineering
188-002-301 B Pavement Layout Plan prepared by Bax 7 February 2022
Engineering
188-002-302 B Sign & Line Marking Layout Plan prepared by 7 February 2022
Bax Engineering
188-002-401 B Drainage Longitudinal Section prepared by Bax 7 February 2022
Engineering
- - Arborist Tree Assessment Report by 27 April 2022
Arboriculture Contractors Australia Pty Ltd
1622_L01-01_04 4 Landscape Notes & Schedules prepared by 19 May 2022
Blackburne Jackson
1622_L03-01_04 4 Landscape Planting Plans prepared by 19 May 2022
Blackburne Jackson
1622_L07-01_04 1 Landscape Details prepared by Blackburne 19 May 2022
Jackson
During Construction
Engineering
56. All works must be constructed and work procedure undertaken in accordance
with:
a. The approved plans/documents and conditions detailed in this Decision
Notice
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines
c. The latest version of the Healthy Waterways document “Water Sensitive
Urban Design Technical Design Guidelines for South East Queensland” for
all water quality devices to be constructed on site
FOLLOWING CONSTRUCTION / PRIOR TO THE COMMENCEMENT OF THE USE
As Constructed Plans and ADAC XML Files (Council)
79. Prior to acceptance of civil works to become Council assets “On Maintenance”,
satisfactory “As-Constructed” records must be submitted to Council. The bundle
of “As Constructed” information shall include:
a. As-Constructed Engineering Drawings. Data is to be submitted in an
electronic drawing file format (.dwg), with all plans clearly endorsed “As-
Constructed”, along with the accompanying hardcopies (PDFs of the As-
Constructed .dwg drawing files), and;
b. ADAC XML Digital File. ADAC File format (ADAC - Asset Design As
Constructed) prepared in accordance with industry standards and recorded
Page 5 of 13