Council archive · source document
Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251
Plans and drawings: the text below has words only, no drawings.
Table 4– MUSIC Rainfall Runoff Parameters
Parameter Value (Commercial)
Rainfall Threshold (mm) 1
Soil Capacity (mm) 18
Initial Storage (%) 10
Field Capacity 80
Infiltration Capacity Coefficient a 243
Infiltration Capacity Coefficient b 0.6
Initial Depth (mm) 50
Daily Recharge Rate (%) 0
Daily Baseflow Rate (%) 31
Deep Storage (%) 0
5.6. Pollutant Export Parameters
The pollutant export parameters for the site were determined from the Water by Design MUSIC Modelling
Guidelines and are shown below in Table 5.
Table 5– MUSIC Pollutant Export Parameters
Log10 TSS (mg/L) Log10 TP (mg/L) Log10 TN (mg/L)
Land Use
(Commercial)
Base Flow Storm Flow Base Flow Storm Flow Base Flow Storm Flow
Mean 0.78 2.43 -0.60 -0.30 0.32 0.37
Road
Std Dev 0.39 0.38 0.50 0.34 0.30 0.34
Mean - 1.30 - -0.89 - 0.37
Roof
Std Dev - 0.38 - 0.34 - 0.34
Mean 0.78 2.16 -0.6 -0.39 0.32 0.37
Ground
Level
Std Dev 0.39 0.38 0.5 0.34 0.30 0.34
5.7. Catchments
To analyse the proposed development in MUSIC, the site was split into various surface types:
Carpark,
Road,
Roof, and
Commercial Ground Level.
STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET Page 8
Scanlon Property Group
R002616
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Stormwater Management Plan by O2Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.