Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251

of 26

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Table 4– MUSIC Rainfall Runoff Parameters

Parameter                                                                             Value (Commercial)

Rainfall Threshold (mm)                                                                       1

Soil Capacity (mm)                                                                           18

Initial Storage (%)                                                                          10

Field Capacity                                                                               80

Infiltration Capacity Coefficient a                                                          243

Infiltration Capacity Coefficient b                                                          0.6

Initial Depth (mm)                                                                           50

Daily Recharge Rate (%)                                                                       0

Daily Baseflow Rate (%)                                                                      31

Deep Storage (%)                                                                              0


5.6.          Pollutant Export Parameters
The pollutant export parameters for the site were determined from the Water by Design MUSIC Modelling
Guidelines and are shown below in Table 5.
Table 5– MUSIC Pollutant Export Parameters

                                      Log10 TSS (mg/L)          Log10 TP (mg/L)                   Log10 TN (mg/L)
 Land Use
 (Commercial)
                              Base Flow        Storm Flow   Base Flow    Storm Flow       Base Flow        Storm Flow

               Mean              0.78              2.43       -0.60         -0.30           0.32              0.37
   Road
               Std Dev           0.39              0.38       0.50           0.34           0.30              0.34

               Mean                   -            1.30         -           -0.89             -               0.37
    Roof
               Std Dev                -            0.38         -            0.34             -               0.34

               Mean              0.78              2.16       -0.6          -0.39           0.32              0.37
  Ground
   Level
               Std Dev           0.39              0.38        0.5           0.34           0.30              0.34


5.7.          Catchments
To analyse the proposed development in MUSIC, the site was split into various surface types:

          Carpark,
          Road,
          Roof, and
          Commercial Ground Level.
STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET                                                            Page 8

Scanlon Property Group
R002616

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4 - Stormwater Management Plan by O2.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.