Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251

of 26

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Details on the catchments utilised for the analysis are shown below in Table 6. The site specific MUSIC
catchment plan is shown in Figure 6.
Table 6 – MUSIC Catchment Parameters

Catchment                                 Area (ha)          Percentage Impervious          Land Use

Carpark                                     0.239                     100                     Road

Road                                        0.051                     80                      Road

Roof                                        0.226                     100                     Roof

Commercial area                             0.023                     100                  Ground level




Figure 6 - MUSIC Catchment Plan


5.8.          Bioretention Systems
The parameters utilised to analyse the bio-retention systems are shown below in Table 7.




STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET                                                   Page 9

Scanlon Property Group
R002616

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4 - Stormwater Management Plan by O2.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.