Council archive · source document
Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251
Plans and drawings: the text below has words only, no drawings.
Details on the catchments utilised for the analysis are shown below in Table 6. The site specific MUSIC catchment plan is shown in Figure 6. Table 6 – MUSIC Catchment Parameters Catchment Area (ha) Percentage Impervious Land Use Carpark 0.239 100 Road Road 0.051 80 Road Roof 0.226 100 Roof Commercial area 0.023 100 Ground level Figure 6 - MUSIC Catchment Plan 5.8. Bioretention Systems The parameters utilised to analyse the bio-retention systems are shown below in Table 7. STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET Page 9 Scanlon Property Group R002616
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Stormwater Management Plan by O2Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.