Council archive · source document
Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251
Plans and drawings: the text below has words only, no drawings.
Figure 7– MUSIC Model Layout and Results 5.10. Results The results of the MUSIC analysis are shown below in Table 8. Table 8 – MUSIC Results Pollutant Reduction (%) Objective (%) Objective Achieved TSS 80.6 80 YES TP 61.4 60 YES TN 49.8 45 YES Gross Pollutants 99.1 90 YES As can be seen in Table 8, the proposed treatment train for the development site is adequate in achieving the required pollutant load based reduction targets. STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET Page 11 Scanlon Property Group R002616
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Stormwater Management Plan by O2Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.