Skip to the record
Beware of cheap imitations.

Council archive · source document

Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251

of 26

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Figure 7– MUSIC Model Layout and Results


5.10.         Results
The results of the MUSIC analysis are shown below in Table 8.
Table 8 – MUSIC Results

Pollutant                          Reduction (%)       Objective (%)            Objective Achieved

TSS                                        80.6             80                         YES

TP                                         61.4             60                         YES

TN                                         49.8             45                         YES

Gross Pollutants                           99.1             90                         YES


As can be seen in Table 8, the proposed treatment train for the development site is adequate in achieving
the required pollutant load based reduction targets.




STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET                                                 Page 11

Scanlon Property Group
R002616

Used in these records

About this file

File size
4.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 4 - Stormwater Management Plan by O2.pdf · 4.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.