Attachment 4 - Stormwater Management Plan by O2 · MCU13/0251
Plans and drawings: the text below has words only, no drawings.
Table 7– MUSIC Bioretention Parameters
Catchment ID Bio-1 Bio-2 Bio-3 Bio-4
High flow bypass (m³/s) 0.033 - 0.02 -
2
Surface area (m ) 20 10 16 10
Extended detention depth (m) 0.3 0.3 0.3 0.3
2
Filter area (m ) 20 10 16 10
Unlined filter media perimeter (m) 42 19.1 24 19.1
Saturated hydraulic conductivity (mm/hr.) 200 200 200 200
Filter depth (m) 0.4 0.4 0.4 0.4
TN content of filter media (%) 400 400 400 400
Orthophosphate content of filter media (mg/kg) 50 50 50 50
Is the base lined? No No No No
Vegetated with effective nutrient removal plants Yes Yes Yes Yes
Overflow weir width (m) 2.8 1 2.1 1
Exfiltration rate (mm/hr.) 0.00 0.00 0.00 0.00
If an exfiltration rate has been used, have node water balance losses been used
N/A N/A N/A N/A
in calculation of treatment train effectiveness
If exfiltration rate has been used is the exfiltration rate justified? N/A N/A N/A N/A
Underdrain present? Yes Yes Yes Yes
Submerged zone with carbon present? No No No No
*
Confirmation that K an C remain default Yes Yes Yes Yes
NOTE: High flow bypasses have been specified for the bioretention systems receiving runoff from the roof
catchments. This is considered to be a conservative modelling approach and takes into consideration the likelihood
that flows in excess of the minor (2 year ARI event) may surcharge the drainage network and potentially bypass the
bioretention system.
This SMP does not locate or provide detailed design of the bioretention filter. It is proposed that the
treatment system will be located within the landscape buffers proposed as part of the carpark area. The
final location and design of the system will be undertaken by the civil consultant in conjunction with the
landscape architect and will be provided as part of the detailed design phase of the project.
The conceptual layout of the drainage system is included as Appendix A.
5.9. MUSIC Model
The MUSIC model produced to analyse the proposed development is shown in Figure 7.
STORMWATER MANAGEMENT PLAN – PEREGIAN VILLAGE MARKET Page 10
Scanlon Property Group
R002616
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 4 - Stormwater Management Plan by O2Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.