RFI - Attachment H - Stormwater Management Plan_Issue C_

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
15 May 2019


Treated water and overflow from the proposed combined treatment / detention tank will discharge off
site via a proposed stormwater connection to the existing stormwater pits constructed as part of the
masterplan ROL.

The treatment plan for the proposed development is depicted on MPN Plan 7700-DA.01 attached in
Appendix 3, with MUSIC excerpt below.


The runoff from the basement subsurface drainage pump out sump will be treated to neutralise any pH
increases due to the acid sulfate soils prior to discharge from site. This system will be separate to the
treatment of the stormwater runoff from the exposed surfaces of the site which will be treated by the
filtration cartridges.




                                                   Figure 3 – Treatment Plan

5.3.3.7 MUSIC Results
The resulting percentage based load reductions at the outlet are shown in Table 5 below together with
the Water Quality Objectives for the receiving waters.


                                                      Sources            Residual Load   % Reduction   Target %


Total Suspended Solids (kg/yr)                         1,840                   168          90.9         80

Total Phosporous (kg/yr)                                3.97                   1.25         68.5         60

Total Nitrogen (kg/yr)                                  29.9                   16.4         45.3         45

Gross Pollutants (kg/yr)                                208                      0          100          90


5.3.3.8 POD Pollutant Reduction

5.3.3.8.1            Litter



Excellence with Economy in Engineering                                                                            13
l:\7000-7999\7700-7799\7700\reports\15-05-19 stormwater management plan_issue c.docx
Log in to download the original file

RFI - Attachment H - Stormwater Management Plan_Issue C_.pdf · 15.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.