RFI - Attachment H - Stormwater Management Plan_Issue C_

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
15 May 2019


                     Install a temporary construction entry/exit sediment trap at all site accesses to
                      minimise mud and sediment from the site being tracked onto public road, particularly
                      during wet weather or when the site is muddy.
                     Install and maintain appropriate sediment fences around construction areas
                            Divert clean stormwater runoff, using catch drains, around construction areas
                                to existing or new stormwater drainage system.
                            Install sandbags and other pollution containment devices around stormwater
                                drains and any other locations where required to prevent sediment entering
                                the trunk stormwater system.
                            Cover open earth/soil areas progressively (with concrete slabs and pavements
                                or mulch) to minimise areas of bare earth/soil.
                            Any stockpiles of excavated soil and demolition / construction waste must be
                                located where risk of erosion and sediment is minimal, and must be protected
                                from wind and water erosion.
                     Implement and maintain appropriate control measures such as catch drains and
                      sediment fences to prevent ponding of stormwater or discharge of stormwater from
                      the site to adjacent properties.
                     Provision of spill / pollution control equipment that is readily accessible to clean up
                      spills and leaks.
                     Ensure spill/pollution control measures are available and maintained in working
                      condition.
                     Sediment contained by the sediment control devices such as sandbags, sediment fences
                      and containment bunds must be frequently removed and placed in a controlled area.
                     Implement an inspection schedule for any spill or leaks of any potential polluting areas
                      or activities.

5.5.4 Erosion Sediment Control Management Goals

          Licenses, approvals, permits and inspection reports are in order.
          Sediment or pollution control devices such as sandbags, sediment fences and containment
           bunds are in place, maintained and effective.
          Spill/ pollution control equipment is readily accessible at designated locations.
          No accumulated sediment is contained by the sediment control devices such as hay bales,
           sediment fences and containment bunds.
          No sediment exceeding a depth of 300mm in the pollution control devices (e.g. silt trap).

5.5.5 Erosion and Sediment Control Implementation Program

          Licenses, permits or approvals for each environmentally relevant activity must be obtained
           prior to the commencement of the particular activity.
          Appropriate control measures such as sediment fences, temporary construction entry/ exit
           sediment traps, pollution containment devices (e.g. sandbags), stormwater diversion and
           administrative controls must be installed and established prior to commencement of the
           earthworks and construction activities.
          Pollution control devices such as spill control equipment must be inspected on a regular basis
           (at least weekly).
          Other sediment and pollution control equipment such as containment bunds, hay bales and
           sediment fences must be inspected on a regular basis (at least daily).


Excellence with Economy in Engineering                                                                           16
l:\7000-7999\7700-7799\7700\reports\15-05-19 stormwater management plan_issue c.docx
Log in to download the original file

RFI - Attachment H - Stormwater Management Plan_Issue C_.pdf · 15.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.