Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

07/2605 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172007.2605

of 33

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

.

‘

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
IPA, schedule 8, part 1, lable 5, tem 7
IP Regulation, schedule 2, table 2, tem 17
IP Regulation, schedule 1, fable 5, item 2 (wild river area)
Water Act 2000, sechon 966C
Wild Rivers Act 2005, section 43A

‘ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA

 

+

1,3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

XX No
LI Yes

IPA, schedule 8, part 1, table 2, lem 7

IPA, schedule 8, part 1, lable 5, items 3 and 4

IP Regulation, schedule 2, table 2, items 1 and 23

Environmental Protection Act 1994, section 73AA (wild river area)
Wild Rivers Act 2005. section 43A

 

 

WITHIN THE LIMITS OF A PORT

 

1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
No
CL] Yes

IP Regulation, schedule 2, table 2, tems 15 and 16

DECLARED FISH HABITAT AREA , }

1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

XI No

(]_ Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
schedule 8, this application requires assessment by the De, Primary Industries and Fisheries (DPI&F). If DPI&F is not

the Assessment Manager for the application, the SI (eas Advice Agency.

IP Regulation, schedule 2, table 2, item 26 *
‘COMMUNITY INFRASTRUCTURE . \\\ 4

1.6 ls any part of the premises designate®for community infrastructure?

& No
CI Yes

IP Regulation, schedule 2, table 3, item 7

WASTE WATER MANAGEMENT ‘ ~ “7

 

 

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

No
{1 Yes

IP Regulation, schedule 2, table 3, ilein 5

 

 

 

SECTION 2 - Section 2 must be completed when the application seeks approval to materially change the use of premises.

 

 

{PLANNING SCHEME ]

2.4 Is the proposed use assessable under the planning scheme?

[_] No- (Go to Question 2.2)
{&_ Yes - (Complete Part D of DAS Application Form 1 and answer Questions 2.1.1 - 2.1.14 below)

if yes, does the application request that the proposal be assessed against a superseded planning scheme?
1 Yes- (Complete Attachment 1)

XJ No

Used in these records

About this file

File size
1.8 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2605 - Preliminary Building Works Assessable Against the Planning Scheme [As Published].pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.