Council archive · source document
Item 11 Appendix E - Stormwater Management Plan-1.0 · MCU22/0094
Plans and drawings: the text below has words only, no drawings.
20 May 2022 6 CONCLUSION This Stormwater Management Plan demonstrates that under the proposed concept plan, stormwater quality and quantity treatment is achievable to the levels required by State Planning Policy July 2017. The lawful point of discharge for the development site is the existing and future Noosa Civic Subdivision stormwater infrastructure south-west of the proposed development. The existing Noosa Civic lawful point of discharge is the Creek to the south of the site. Stormwater runoff from the new roof, carpark, internal road and servicing areas will be directed to a bioretention basin for stormwater quality treatment. High flow bypasses will be constructed around the bioretention basins for flows exceeding the treatment flows. Approximately 58m2 of the access driveway and landscaped areas will bypass the bioretention basins to allow the driveways to join neatly into the existing internal road system. The treated areas will be over treated so the overall net water quality objectives are achieved for the development. Stormwater discharged from site is proposed to be consistent with the existing Noosa Civic Subdivision. The development sits within a lot that has been allowed for in subdivision works stormwater calculations, therefore no detention is proposed for this development. 7 LIMITATIONS OF REPORT MPN have prepared this report for the proposed childcare centre development at Lot 4, Noosa Business Centre, Eenie Creek Road Noosaville in accordance with MPN’s proposal to Stockwell. This report is provided for the exclusive use of Stockwell for this specific project and its requirements. It should not be used or relied upon by a third party and MPN accept no responsibility for the use of this report by any party other than Stockwell. Excellence with Economy in Engineering 16 l:\9000-9999\9300-9399\9307\reports\20-05-22 stormwater management plan_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Item 11 Appendix E - Stormwater Management Plan-1.0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.