                                                                         Officer:            Georgina Schramm
                                                                         Direct Telephone:   07 53296569
                                                                         Our Reference:      51901.3604.03
                                                                         Your Reference:     n/a

               3 May 2024


               Rumah Design Studio
               C/- Rumah Design Studio
               12 Munga St
               COOLUM BEACH QLD 4573
               [email protected]



               Dear Applicant,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 23 August 2023, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              51901.3604.03

                   Street address:              Culgoa Point 54/5 Quamby Pl Noosa Heads Qld 4567

                   Real property description:   Lot 54 BUP 4076

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 23 & 24 January 1980
               •       Town Planning Consent – Multiple Dwelling – 65 Units (Class B)
               In relation to the request to make a minor change to the existing approval, Council on 3 May 2024,
               decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change
               B.      Include additional conditions 33, 34, 36
               3.      CURRENCY PERIOD OF APPROVAL

               Not applicable.
               4.      ASSESSMENT MANAGER CONDITIONS

               1.      Compliance with the conditions of TPC 1057. – (Attached)
               2.      Deleted.
               3.      Provision of 7 carparking spaces and altered access thereto which are to be provided

               ABN 97.969.214.121                                                               PO Box 141
               noosa.qld.gov.au                                                          Tewantin QLD 4565
               [email protected]                                                          07 5329 6500
                                                                                                         Page 1 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024
Full text of the other 11 pages

Page 2

                      with a sealed pavement and designed, drained, constructed and maintained in
                      accordance with the Planning Scheme, Council's Policies and to the reasonable
                      satisfaction of the Shire Engineer. Plans and specifications for these works are to be
                      submitted to the Shire Engineer for approval in conjunction with the Building
                      Application. A Building Approval shall not be granted until the Shire Engineer has
                      approved of the carparking and access scheme.
               4.     There is to be no detrimental effect upon the amenity of the neighbourhood by reason
                      of the creation of excessive noise, lighting nuisance or other emissions.
               5.     The open space and setback areas are to be landscaped in accordance with Council's
                      Policy on Landscaping Guidelines and a properly prepared landscape plan to be
                      submitted to and approved by the Shire Planner, prior to the issue of a Building
                      Approval. Such landscaping is to be completed in accordance with the approved
                      landscape plan, prior to the premises being occupied and maintained at all times
                      thereafter to the reasonable satisfaction of the Shire Planner.
               6.     Existing trees on the site and within road reserves are to be retained, except where
                      required to be removed due to building operations or the conduct of the approved use.
               7.     Construction work and other associated activities are permitted only during the hours
                      of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays,
                      except where extended hours are approved by the Building Surveyor.
               8.     Roof and surface water is to be collected on site and is to be discharged through a
                      single underground drain line into existing drainage to the satisfaction of the Shire
                      Engineer. A Building Approval shall not be granted until the Shire Engineer has
                      approved of the drainage scheme.
               9.     Submission of a cash bond or trading bank guarantee to the sum of $2000 to secure
                      performance of conditions, prior to the issue of Building Approval. The cash bond or
                      trading bank guarantee will be returned upon performance of the conditions of
                      approval.
               10.    The provisions of this approval are to be effected, prior to the commencement of the
                      approved use. Council reserves the right to call upon the bond or guaranteed sum
                      referred to in this approval for the purposes of litigation should the use not be conducted
                      in accordance with this approval.
               Additional conditions – 2 May 2019
                      When Conditions must be Complied With
               11.    Unless otherwise stated, all conditions of this Decision Notice must be complied with prior
                      to the use commencing, and then compliance maintained at all times while the use
                      continues.
                      Approved Plans
               12.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.            Rev.   Plan/Document Name                             Date

                        WD 1.4              A      Ground Floor Plan drawn by Sparks 17/07/2018
                                                   Architects

                        WD1.5               A      First floor and Roof Plan                      17/07/2018




                                                                                                    Page 2 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Page 3

                        WD 4.1                A    Construction Details                          17/07/18

                        WD 4.2                A    Construction Details                          17/07/18

                      Damage to infrastructure
               13.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
               Additional Conditions 24 March 2020
               14.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.       Rev.        Plan/Document Name                            Date

                        WD 1.1         A           Title Sheet, prepared by Sparks Architects    28.10.19

                        WD 1.5         B-WIP       Site Plan, prepared by Sparks Architects as 29.01.2020
                                                   annotated by Council

                        WD 1.7         A           Ground Floor Plan, prepared by Sparks 28.10.19
                                                   Architects as annotated by Council

                        WD 1.8         A           First and Second Floor Plan, prepared by 28.10.19
                                                   Sparks Architects as annotated by Council

                        WD 1.9         A           Roof Plan, prepared by Sparks Architects as 28.10.19
                                                   annotated by Council

                        WD 2.1         A           Elevations Sheet 1, prepared by Sparks 28.10.19
                                                   Architects as annotated by Council

                        WD 2.2         A           Elevations Sheet 2, prepared by Sparks 28.10.19
                                                   Architects as annotated by Council

                        WD 3.1         A           Sections, prepared by Sparks Architects as 28.10.19
                                                   annotated by Council

                        WD 9.1         A           3D Perspective, prepared by Sparks 28.10.19
                                                   Architects as annotated by Council

                        LP000          D           Cover Sheet, prepared by Conlon Group         09.03.20

                        LP001          D           Schedule of Finishes, prepared by Conlon 09.03.20
                                                   Group

                        LP002          D           Planting Schedule and General Notes, 09.03.20
                                                   prepared by Conlon Group

                        LP201          D           Set out & Surfaces Plan Ground Floor Plan, 09.03.20
                                                   prepared by Conlon Group

                        LP202          D           Set out & Surfaces Plan Ground Floor Plan, 09.03.20
                                                   prepared by Conlon Group




                                                                                                    Page 3 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Page 4

                        LP203            D            Set out & Surfaces Plan First Floor Roof 09.03.20
                                                      Plan, prepared by Conlon Group

                        LP301            D            Planting Plan – trees, climbers & large 09.03.20
                                                      shrubs Ground Floor Plan, prepared by
                                                      Conlon Group

                        LP302            D            Planting Plan – trees, climbers & large 09.03.20
                                                      shrubs Ground Floor Plan, prepared by
                                                      Conlon Group

                        LP303            D            Planting Plan –shrubs & ferns Ground Floor 09.03.20
                                                      Plan, prepared by Conlon Group

                        LP304            D            Planting Plan – shrubs & ferns Ground Floor 09.03.20
                                                      Plan, prepared by Conlon Group

                        LP305            D            Planting Plan – Ground Covers & Orchids – 09.03.20
                                                      Ground Floor Plan, prepared by Conlon
                                                      Group

                        LP306            D            Planting Plan – Ground Covers & Orchids – 09.03.20
                                                      Ground Floor Plan, prepared by Conlon
                                                      Group

                        LP307            D            Planting Plan Level 1 Roof Plan, prepared 09.03.20
                                                      by Conlon Group

                        LP401            D            Landscape details, prepared by Conlon 09.03.20
                                                      Group

                        LP402            D            Landscape details, prepared by Conlon 09.03.20
                                                      Group

                        Page 25          A            Landscape Perspective,        prepared    by -
                                                      Conlon Group

               15.    The roof of the reception/office building must be landscaped or alternatively include a 5-
                      degree roof pitch and eaves to 75% of the perimeter of the building.
               16.    The pergola covering the walkway must be setback a minimum of 6m from the rear
                      boundary (River boundary).
               17.    A sealed access driveway and pedestrian access must be provided from Quamby Place to
                      all parking and manoeuvring areas of the development generally in accordance with the
                      approved plans. The works must be undertaken in accordance with an operational works
                      approval and must include in particular:
                      a.      external works - crossover, footpath, on street car parking and line marking.
               18.    Landscaping must be generally in accordance with the approved landscaping plans and
                      Planning Scheme Policy PSP 3 – Landscaping Plants and Guidelines. The following plants
                      are not approved to be used:
                      a.      magnolia grandiflora must be replaced with native species such as Elaeocarpus
                              Eumundi; and
                      b.      spathiphyllum floribundum (Peace lily) must be replaced with native species.
               19.    The area in the road reserve between the vehicle crossover and the adjacent footpath


                                                                                                       Page 4 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Page 5

                      (directly in front of the planter and outside the property boundary) must be turf and not hard
                      stand.
               Demolition Conditions 24 March 2020
                      Approved Plans
               20.    Development undertaken in accordance with this approval must comply with the approved
                      plan of development. The approved plan is listed in the following table unless otherwise
                      amended by these conditions.

                           Plan No.           Rev.   Plan/Document Name                             Date

                           WD 1.6             A      Demolition Plan 1:200, prepared by Sparks 28.10.19
                                                     Architects

                      Performance Bond
               21.    Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must
                      be submitted to Council prior to the issue of a Development Permit for Building Works for
                      demolition, to secure the demolition conditions of this approval. The cash bond or trading
                      bank guarantee will be returned on performance of the demolition conditions of this
                      approval less any costs incurred by Council in respect of enforcing performance of these
                      demolition conditions. Council reserves the right to call upon the bond or guaranteed sum
                      to effect compliance with conditions.
                      Works
               22.    Demolition must be undertaken in a manner that causes no detrimental effect upon the
                      amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-
                      borne hazards, atmospheric pollutants (including dust or odours) nuisance or any other
                      emissions in accordance with the nuisance provisions of the Environmental Protection Act
                      1994.
                      Waste management
               23.    A Waste Management Plan (demolition) must be submitted in accordance with Planning
                      Scheme Policy 11 - Waste Management Plan and approved by Council’s Waste
                      Coordinator prior to issue of a development permit for Building Works for demolition,
                      removal or relocation.
                      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
                      effective reuse and recycling of such materials. Segregated wastes attract significantly
                      reduced disposal fees at the landfill with some items free. Higher gate fees are charged for
                      mixed waste.
                      Waste storage areas must provide for adequate separation of all reusable, recyclable and
                      waste materials. These must be located so that they are convenient and safe to use.
                      The Plan must contain the following information:
                      a.      The areas for the storage and separation of waste shown on a site plan;
                      b.      A waste management table as indicated below is to be completed showing how waste
                              material is to be segregated - recycled – reused or disposed; and
                      c.      Table – Waste Management Table




                                                                                                        Page 5 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Page 6

                          MATERIALS ON-SITE                                DESTINATION
                                                               Re-use and Recycling                     Disposal
                          Expected waste    Estimated  On-site            Off-site                  *specify
                          materials         volume(m³) *specify proposed *specify                   contractor     and
                                                       re-use or on-site contractor     and         landfill site or
                                                       recycling methods recycling outlet           other disposal site
                          Excavation
                          material
                          Green waste
                          Bricks
                          Concrete
                          Timber-please
                          specify
                          Plasterboard
                          Metals - please
                          specify
                          Asbestos
                          Other - please
                          specify
                      Note * If a demolition contractor is undertaking works, then the Waste Management table is
                      to be completed by the demolition contractor.
                      Damage to infrastructure
               24.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
                      Vacant site
               25.    The site must be left clean and tidy free from debris such as concrete, wire, rubble, brick/s
                      and the like. If the site remains vacant for more than 30 days the lot must be turfed or
                      landscaped in accordance with Planning Scheme Policy PSP 3 – Landscaping Plants and
                      Guidelines and to the satisfaction of Council so as to not cause nuisance to the surrounding
                      area.
               26.    All waste materials must be removed from site.
                      Litter, erosion and sediment control
               27.    Litter, erosion and sediment control measures must be installed and maintained until soils
                      are stabilised by turf, vegetation or sealed.
                      Note: it is an offence under the Environmental Protection Act 1994 to deposit or potentially
                      allow litter, waste, soil, or other contaminants to enter a waterway or storm water drainage
                      system (e.g. roadside gutter).
                      Asbestos
               28.    Removal of building materials containing asbestos must be undertaken by a licensed
                      asbestos removalist.
               29.    Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
                      requires a licensed asbestos removalist to give notice to Workplace Health and Safety
                      Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
                      commences. Notification must be made using Form 65: Notification of licensed asbestos
                      removal work, demolition work or emergency demolition.
               30.    All building materials containing asbestos products are wrapped and disposed of in
                      accordance with the Public Health Regulation 2006 and the Environmental Protection
                      Regulation 2008.
                      Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses


                                                                                                      Page 6 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Page 7

                      businesses that transport asbestos waste, and landfills that accept this waste.
               31.    All building materials containing asbestos, including asbestos cement sheeting or roofing
                      and lagging are removed from the building prior to demolition/relocation.
                      Plumbing and Drainage
               32.    It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
                      demolition of a building, the existing sanitary drain upstream from the connection point for
                      a service provider’s sewerage system must be sealed water tight. This work is deemed as
                      notifiable Work and must be carried out by a suitably licenced plumber who must submit an
                      As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland
                      Building Construction Commission) within 10 days of completing the work
               Additional Conditions 2 May 2024
                      Approved Plans – Unit 54
               33.    Development undertaken in accordance with this approval must comply with the approved
                      plan of development. The approved plans are listed in the following table unless otherwise
                      amended by these conditions.

                        Plan No.             Rev.    Plan/Document Name                              Date

                        212219 – 08.5        C       Proposed First Floor Plan prepared by Kate 24.04.2024
                                                     Castwood
                                                     (Annotated by Council)

                        212219 – 08.6        C       Proposed Sections prepared by Kate 24.04.2024
                                                     Castwood

                        212219 – 08.7        C       Elevations prepared by Kate Castwood            24.04.2024

                        212219 – 08.8        C       Elevations prepared by Kate Castwood            24.04.2024

               34.    The annotated “media room” is to be used as a common area only and is not to be fully
                      enclosed by walls.
               35.    The wall adjacent to the void is to be returned to a nib wall, and is not to exceed a height of
                      1.5 metres. The door and wall from the common landing to the media room are also to be
                      removed.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.




                                                                                                        Page 7 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Page 8

                      You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations
                      under the ACH Act.
                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
                      Development Compliance Inspection
               3.     Prior to the commencement of the use, please contact Council's DA Planning Section to
                      arrange a Development Compliance Inspection.
                      Infrastructure Charges – 24 March 2020
               4.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue.
                      Infrastructure Charges – 3 May 2024
               5.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further information, please refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                •       Development Permit for Building Works (All Building Works)

               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                            Page 8 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Page 9

               Yours faithfully,




               Georgina Schramm
               Development Planner



               Enc:     Appeal Rights
                        Approved Plans/Documents
                        TPC 1057
               cc.      Unitywater




               DECISION NOTICE HISTORY
               •     Original Decision Notice – 23rd & 24 January 1980
               •     Negotiated Decision Notice – 22 July 1993 – modification to approved plans

               •     Decision Notice - Minor 51901.3604.01 – 2 May 2019 – Additional conditions

               •     Decision Notice – Minor – 51901.3604.02 – 24 March 2020 – Include additional conditions 14-32

               •     Decision Notice – Minor – 51901.3604.03 – 3 May 2024 – Include additional conditions 33-35.




                                                                                                                     Page 9 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Page 10

                                       Page 10 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024


[OCR of page images]
 

Page 10 of 12
Document Set ID: 23003343

Version: 4, Version Date: 03/05/2024

Page 11

                                       Page 11 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024


[OCR of page images]
 

STANOMRD CONDITIONS FOR MULTIPLE CePLLIi
SS LLCS

1. Compliance with all relevant by-laws and Policies.

"2. Mininun disturbance to natural flora, No vegetation to be removed
ao other thon that which would impede building operations, Where Practicable,
re-vegetation to be carried out following cessation of building activity.

. es
.° 3. Permanent covered car parking to be provided on the site for...s+s+.vehicles,
: together with space sufficient for.....+.4+4..visitors' vehicles. Areas on
' which vehicles will be driven and/or parked to be provided with a flexible
a7 ret or other pavement surface with bitumen seal coat, asphaltic or other’
concrete properly constructed and maintained to good engineering standards
to the satisfaction of .the Council's Engineer. Plans and specifications for
@uch sreas including footpath crossings to be subnittea prior to issue of
a-building permit. Vehicular access to and from the site to be designed
s0 as to ensure that sufficient area is available for manoeuvring and turning
to permit forward movenent to and from the road. Bre ee

4%. A concrete invert and paved access to connect to the existing bitumen
* Foad pavemont to be constructed to the satisfaction of the Council's Engineer,

 

  

 

 

 

- 35. tal pe 2
. 2 Council. Dosigns to be approved prior to the issue of a building pernit,
coms. © _ ©) Constewesion of a sewage and Sullage holding tank to the satisfaction
‘ of Council, .
4 PR ~ re nl . : r ad
t (ce). Connection to Council's sewerage system. aCe

 

ar ; 6. Connection to Council's water supply facility at the applicant's expense.

‘ ; 2% fa) Stormater, including that from roofea and paved ercas to be disposed
i ‘ of by underground means to Council's existing disposal facilities.
. . - _

() “Stormreter-te Devarepestd of on site “20 as to cause no scour or damage
to adjoining properties, a . ae : Ne Be
Wo earthvoris or filling are to be carried out on the site until the-
regurements of the Council's Engineer have bren obtained in writing.

Such requirements to be obtained Prior to the issue of a building permit.

Comply with the reasonable requiremants of the Regions] Fire Safety Officer,
The approval given herein is for Town Plan Consent only and does rot imply

. either tho issue of a building permit or Council Consent to an application
“|. wnder the Group Titles Act or Building Unit Titles Act. . ©

 

uu. This approval will lapse if not availed of within two (2) years in
accordance with clause 3 (2) of Part II of Council By-laws Chapter XLIV -
" fewn Planning, i. S ony at

; ia. A certificate of alignment to be submitted with the ‘pplication for a building
© permit and/or an identification Survey to ke carried out by an euthorised
Surveyor at the tire of the foundation inspection, 3,

x

13. To ensure compliance with any and all conditions of this “Dpprovel, Council
z - will require that yeu enter into a Bank Bond to guerantee performance.

‘24. ‘The conditions of this consent are to be completed prior to occupancy of the ?
4 building and if this is not done, Council reserves the right to call on
ag bond moneys lodged te carry out the works involved, ‘ss

   

Page 11 of 12

Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Page 12

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 12 of 12
Document Set ID: 23003343
Version: 4, Version Date: 03/05/2024

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 51901 3604 03.pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.