Negotiated Decision Notice - Concurrence Agency - DNRW [As Published] · 132007.1413
2007/1413
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered:
Plan / Rev. Plan / Document Name Date
Document No.
40487 A Development Plan of Proposed Material 20/12/07
Change of Use in Lot 89 on SP 158854
Demonstrating Proposed Cabins –
Murray & Associates (QLD) Pty Ltd
Floor Plan – Statewide Transportables
Elevations – Statewide Transportables
and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
2
3. All cabins shall not exceed 100m in gross floor area, not include a laundry and shall be used
for overnight or holiday accommodation only.
4. Cabin 1 shall be setback a minimum 30 metres from the adjoining property boundary.
5. The setback areas between Cabin 1 and the adjoining property and Black Mountain Road
shall be planted with native trees and shrubs to provide a dense visual screen.
6. The development shall be undertaken in accordance with the recommendations of the
Bushfire Hazard Assessment Report prepared by Bushfiresafe (Aust) Pty Ltd) and dated 30
November 2007.
7. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. These landscape
plans required to be submitted are to denote areas of existing vegetation or existing trees
proposed or required to be retained.
8. Any advertising sign or device is to comply with Council's policies on advertising.
9. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
10. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
11. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
12. The Development Permit for a material change of use of premises lapses if the use has not
happened by 19 August 2012, unless an application to extend the currency is approved by
Council.
2 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - Concurrence Agency - DNRW [As Published]Related documentApplication case desk ↗
About this file
- File size
- 153 KB (small file)
- File type
No other editions are linked here.