2111-25662 SRA - Response with conditions - MCU21.0186
Attached to the e-mail Concurrence Response MCU21/0186 (OPW21 0301).
RA6-N SARA reference: 2111-25662 SRA Council reference: MCU21/0186 & OPW21/0301 Applicant reference: 04560 3 November 2021 Chief Executive Officer Noosa Shire Council PO Box 141 Tewantin Qld 4565 [email protected] Attention: Diogo Carrico Dear Mr Carrico SARA response—18 Cooran Court, Noosa Heads (Referral agency response given under section 56 of the Planning Act 2016) The development application described below was confirmed as properly referred by the State Assessment and Referral Agency on 3 November 2021. Response Outcome: Referral agency response – with conditions. Date of response: 3 November 2021 Conditions: The conditions in Attachment 1 must be attached to any development approval. Advice: Advice to the applicant is in Attachment 2. Reasons: The reasons for the referral agency response are in Attachment 3. Development details Description: Development permit Operational work for prescribed tidal works (pontoon) SARA role: Referral agency SARA trigger: Schedule 10, Part 17, Division 3, Table 2, Item 1 (Planning Regulation 2017) Development application for operational work for tidal works in tidal South East Queensland (North) regional office Mike Ahern Building, Level 3, 12 First Avenue, Maroochydore Page 1 of 7 PO Box 1129, Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
2111-25662 SRA
waters (maritime safety)
SARA reference: 2111-25662 SRA
Assessment Manager: Noosa Shire Council
Street address: 18 Cooran Court, Noosa Heads
Real property description: Lot 229 on N21857
Applicant name: Omarosa Pty Ltd
Applicant contact details: C/- The Jetty Specialist
18 Ron Parkinson Cres
Corbould Park QLD 4551
[email protected]
Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment Rules)
Copies of the relevant provisions are in Attachment 4.
A copy of this response has been sent to the applicant for their information.
For further information please contact Candace Canniffe, Senior Planning Officer, on 5352 9708 or via
email [email protected] who will be pleased to assist.
Yours sincerely
Danika Cowie
Principal Planning Officer
cc Omarosa Pty Ltd, [email protected]
enc Attachment 1 - Referral agency conditions
Attachment 2 - Advice to the applicant
Attachment 3 - Reasons for referral agency response
Attachment 4 - Representations provisions
State Assessment and Referral Agency Page 2 of 7
Page 3
2111-25662 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. Conditions Condition timing
Operational work
Schedule 10, Part 17, Division 3, Table 2, Item 1 – Tidal works or work within a coastal management
district—The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
1. The proposed pontoon must be carried out generally in accordance At all times
with the following plan:
Site Plan, Layout Plan & Water Allocation, prepared by The
Jetty Specialist, dated 03/08/2021, drawing number JSP-SJ-
34990 and revision A.
2. The structure must be lit/marked in accordance with the following At all times
specifications, such that it does not cause a risk to the safe
navigation of other ships:
(a) Section 3 of AS4282-1997 Control of the obtrusive effects of
outdoor lighting.
3. The construction, operation or maintenance of the structure, and any At all times
ship berthed, moored or attached to the structure, must not:
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone.
4. Any debris or similar obstruction generated whilst undertaking the While works are
work must be removed from the waterway and suitably disposed of occurring
at the applicant’s expense.
5. All piles and/or structures to be demolished both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works
State Assessment and Referral Agency Page 3 of 7
Page 4
2111-25662 SRA
Attachment 2—Advice to the applicant
General advice
1. Terms and phrases used in this document are defined in the Planning Act 2016 its regulation or
the State Development Assessment Provisions (SDAP) 2.6. If a word remains undefined it has
its ordinary meaning.
State Assessment and Referral Agency Page 4 of 7
Page 5
2111-25662 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for this decision are:
The proposed development is located in a canal.
The proposed development is for the construction of a private pontoon.
The proposed structure, including any vessel berthed, moored or attached to the structure:
a. will not encroach into, pass over or under a navigation corridor; and
b. is not located in a high risk maritime development zone.
The proposed structure meets the FastTrack5 qualifying criteria checklist 4.
Material used in the assessment of the early referral response:
The development application material and submitted plans
State Development Assessment Provisions (version 2.6) published by SARA
The Development Assessment Rules
Planning Act 2016
Planning Regulation 2017
SARA DA Mapping System
Human Rights Act 2019
State Assessment and Referral Agency Page 5 of 7