                                                                                                       2111-25662 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)


 No.     Conditions                                                                     Condition timing
 Operational work
 Schedule 10, Part 17, Division 3, Table 2, Item 1 – Tidal works or work within a coastal management
 district—The chief executive administering the Planning Act 2016 nominates the Director-General of
 the Department of Transport and Main Roads to be the enforcement authority for the development to
 which this development approval relates for the administration and enforcement of any matter relating
 to the following conditions:
 1.      The proposed pontoon must be carried out generally in accordance               At all times
         with the following plan:
              Site Plan, Layout Plan & Water Allocation, prepared by The
                  Jetty Specialist, dated 03/08/2021, drawing number JSP-SJ-
                  34990 and revision A.
 2.      The structure must be lit/marked in accordance with the following              At all times
         specifications, such that it does not cause a risk to the safe
         navigation of other ships:
             (a) Section 3 of AS4282-1997 Control of the obtrusive effects of
                 outdoor lighting.
 3.      The construction, operation or maintenance of the structure, and any           At all times
         ship berthed, moored or attached to the structure, must not:
             (a) encroach into, pass over or under a navigation corridor or
             (b) be located in a high risk maritime zone.
 4.      Any debris or similar obstruction generated whilst undertaking the             While works are
         work must be removed from the waterway and suitably disposed of                occurring
         at the applicant’s expense.
 5.      All piles and/or structures to be demolished both above and below              Prior to the completion
         the waterline must be completely extracted/removed.                            of the works




 State Assessment and Referral Agency                                                                     Page 3 of 7
Log in to download the original file

2111-25662 SRA - Response with conditions - MCU21.0186.pdf · 229 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.