Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2111-25662 SRA - Response with conditions - MCU21.0186

Attached to the e-mail Concurrence Response MCU21/0186 (OPW21 0301).

of 7

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                        2111-25662 SRA




Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

The reasons for this decision are:
    The proposed development is located in a canal.
    The proposed development is for the construction of a private pontoon.
    The proposed structure, including any vessel berthed, moored or attached to the structure:
       a. will not encroach into, pass over or under a navigation corridor; and
       b. is not located in a high risk maritime development zone.
    The proposed structure meets the FastTrack5 qualifying criteria checklist 4.

Material used in the assessment of the early referral response:
 The development application material and submitted plans
 State Development Assessment Provisions (version 2.6) published by SARA
 The Development Assessment Rules
 Planning Act 2016
 Planning Regulation 2017
 SARA DA Mapping System
 Human Rights Act 2019




 State Assessment and Referral Agency                                                      Page 5 of 7
Log in to download the original file

2111-25662 SRA - Response with conditions - MCU21.0186.pdf · 229 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.