Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appeal 26-042 - Lodgement Documents

of 276

Page text read automatically using OCR, there may be inaccuracies

20 Peregian Esplanade, Peregian Beach




 PURPOSE & OVERALL OUTCOMES                                            PROPOSAL                                                   COMPLIANCE
1) The purpose of the Earthworks code is to ensure earthworks do not unreasonably impact on the natural environment or other pro perties and provide a
   safe and secure work environment.
2) The overall outcomes sought for the Earthworks code are:
a) Earthworks are designed and constructed to be structurally sound.  The proposed development involves minimal
b) All onsite works provide land stability (including differential earthworks near the rear of the site. Nonetheless, the ☒Compliant
   settlement or expansion in reactive soils).                        proposed works will provide land stability and will ☐N/A
c) Earthworks avoid contamination of land.                            utilise clean materials to avoid the contamination of ☐Performance Solution
d) Flooding and drainage are appropriately addressed.                 land.
e) Groundwater, watercourses and wetlands are protected.
f) The loss of native remnant or regrowth vegetation is avoided.




4.2.2    Performance Outcomes & Acceptable Outcomes
 PERFORMANCE OUTCOMES                           ACCEPTABLE OUTCOMES                       PROPOSAL                                      COMPLIANCE
 Assessable Development
 Effects of works
 Drainage                                       AO1                                       AO1
 PO1                                            Filled or excavated areas have a          The proposed development does not             ☒Compliant
 Finished surface levels ensure land is free    minimum gradient of 0.5% and drain to     involve amendments to the existing            ☐N/A
 draining.                                      Council’s stormwater infrastructure       stormwater management over the site.          ☐Performance Solution
                                                where available, or where stormwater      As such, the proposed stormwater
                                                infrastructure is not available, toward   generated by the site will be drained to
                                                the street.                               Council’s stormwater infrastructure.

 Hydraulics                                                                               AO2
 PO2                                            No acceptable outcome provided            The subject site is not identified as being   ☐Compliant
 Change to the levels on site do not have an                                              flooded by any source. As such, this          ☒N/A
 adverse impact on the flooding and drainage                                              criterion is not applicable.                  ☐Performance Solution
 characteristics off-site.




                                                                                                                                                                78

Log in to download the original (Appeal 26-042 - Lodgement Documents.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.