Original source · versioned page text
Appeal 26-042 - Lodgement Documents
20 Peregian Esplanade, Peregian Beach PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE Geotechnical considerations AO3.1 AO3.1 PO3 Filling works are undertaken in The proposed earthworks will be ☒Compliant Earthworks do not result in geotechnical accordance with Council’s Planning undertaken in accordance with the ☐N/A instability on-site or to nearby premises. Scheme Policy PSP6 Engineering design relevant planning scheme policy. ☐Performance Solution standards - roads, drainage and earthworks. AO3.2 AO3.2 Where the filling is for residential, The proposed earthworks will be ☒Compliant commercial or industrial purposes the undertaken in accordance with the ☐N/A works comply with Australian Standard - relevant Australian Standards. ☐Performance Solution Guidelines for earthworks on commercial & residential development. Local amenity AO4.1 AO4.1 PO4 The following control measures are The proposed development can comply ☒Compliant Undertaking earthworks does not adversely implemented— with this outcome. ☐N/A impact on the amenity of the local area by way a) regular water spraying of ☐Performance Solution of dust, noise or visual amenity. exposed areas to suppress dust; b) provision of dust stabilised or sealed internal roads; c) protective covering of exposed areas that are left for more than 2 weeks; and d) unless a development permit provides otherwise, disturbed areas are revegetated using species identified in Council's Planning Scheme Policy PSP2 Landscaping. 79
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appeal 26-042 - Lodgement Documents.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.