Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appeal 26-042 - Lodgement Documents

of 276

Page text read automatically using OCR, there may be inaccuracies

20 Peregian Esplanade, Peregian Beach




 PERFORMANCE OUTCOMES                             ACCEPTABLE OUTCOMES                        PROPOSAL                              COMPLIANCE
 Geotechnical considerations                      AO3.1                                      AO3.1
 PO3                                              Filling works are undertaken in            The proposed earthworks will be       ☒Compliant
 Earthworks do not result in geotechnical         accordance with Council’s Planning         undertaken in accordance with the     ☐N/A
 instability on-site or to nearby premises.       Scheme Policy PSP6 Engineering design      relevant planning scheme policy.      ☐Performance Solution
                                                  standards - roads, drainage and
                                                  earthworks.
                                                  AO3.2                                      AO3.2
                                                  Where the filling is for residential,      The proposed earthworks will be       ☒Compliant
                                                  commercial or industrial purposes the      undertaken in accordance with the     ☐N/A
                                                  works comply with Australian Standard -    relevant Australian Standards.        ☐Performance Solution
                                                  Guidelines for earthworks on commercial
                                                  & residential development.
 Local amenity                                     AO4.1                                     AO4.1
 PO4                                               The following control measures are        The proposed development can comply   ☒Compliant
 Undertaking earthworks does not adversely         implemented—                              with this outcome.                    ☐N/A
 impact on the amenity of the local area by way    a)    regular water spraying of                                                 ☐Performance Solution
 of dust, noise or visual amenity.                       exposed areas to suppress dust;
                                                   b)    provision of dust stabilised or
                                                         sealed internal roads;
                                                   c)    protective covering of exposed
                                                         areas that are left for more than
                                                         2 weeks; and
                                                   d)    unless a development permit
                                                         provides otherwise, disturbed
                                                         areas are revegetated using
                                                         species identified in Council's
                                                         Planning Scheme Policy PSP2
                                                         Landscaping.




                                                                                                                                                           79

Log in to download the original (Appeal 26-042 - Lodgement Documents.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.