2 Emerald Planning Report
MCU14/0091 Equitable Access and Facilities 1. The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities. Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work: a. the Disability Discrimination Act 1992 (Commonwealth); b. the Anti-Discrimination Act 1991 (Queensland); and c. the Disability (Access to Premises – Buildings) Standards. Development Compliance Inspection 2. Prior to the commencement of the use, please contact Council's DA Planning Section to arrange a Development Compliance Inspection. Infrastructure Charges 3. This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Adopted Infrastructure Charges Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the Sustainable Planning Act 2009. Noise 4. It is highly recommended the person engaged to certify the installation of mechanical equipment is involved at the plan development stage to recommend where this equipment is best located. They can also advise about noise enclosures and can make other suggestions to avoid noise problems. It is a lot more costly to try and deal with noise problems after everything is built. Building and Construction Industry (Portable Long Service Leave) Levy 5. The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855. Co-ordination of Operational Works Assessment 6. Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application. Preparation of a Preliminary Construction Management Plan 7. A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following: a. traffic management during all aspects of the construction phase including: i. a Traffic Management Control Plan in accordance with the Manual of Uniform Traffic Control Devices (MUTCD) detailing all temporary signage and traffic control measures prior to construction ii. maintenance of safe pedestrian access for the areas affected by the works during and after daily construction has ceased Page 7 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.