                                                                             MCU14/0091


31.   A Waste Management Plan (Operational) in accordance with Planning Scheme
      Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial
      Premises”, must be submitted for the day-to-day operation of the development and
      approved by Council’s Health Section prior to issue of development permit for
      operational works. The Waste Management Plan must include the following:
      •    the types of waste that will be generated from the activities approved within
           the development
      •    estimated volumes or tonnage of both recyclables and waste generated
      •    methods to be used for dealing with garden waste
      •    initiatives to minimize waste either by waste prevention, reduction, re-use or
           recycling
      •    description of procedures for getting all waste to the bins; the storage of bins
           and the collection of bins by the contractor
      •    a detailed description of vehicular access to collect waste. Where collection
           is off street, access must allow vehicles to enter and leave the site in a
           forward direction.
      Noise Nuisance
32.   Noise emission from mechanical equipment must comply with the following
      requirements:
      a.   Air-conditioning and Refrigeration
           •      7am to 10pm: Maximum background + 5dB(A)
           •      10pm to 7am: Maximum background + 3dB(A)
      b.   Pumps
           •      7am to 7pm: Maximum background + 5dB(A)
           •      7pm to 10pm: Maximum background + 3dB(A)
           •      10pm to 7am: No audible noise.
33.   Submission of written certification from a suitably qualified person confirming that
      the noise levels from all mechanical equipment comply when measured at the
      most exposed part of an affected building, whichever is the closest to the
      equipment.
      The assessment and certification is required immediately after installation of the
      equipment and prior to any occupation of the building, and in a format approved by
      Council. All equipment should be operating at the same time to test the overall
      noise level created.
5     REFERRAL AGENCIES

Not Applicable.
6     ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:




                                                                                 Page 6 of 11
Log in to download the original file

2 Emerald Planning Report.pdf · 7.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.