7. A footing system and erosion protection system must be designed to withstand
the short-term erosion associated with a 500-year average recurrence interval
storm event combined with shoreline recession due to sea-level rise for 2100
climate change.
The short-term erosion associated with a 500-year average recurrence interval
storm event combined with shoreline recession due to sea-level rise for 2100
climate change to be considered for the design of stabilisation measures must
be that shown on Figure 8-3 of the 2019 Omtrek report “Working Notes: Mason
v Noosa Shire Council - 54 Seaview Terrace, Sunshine Beach”, (Reference
J0033 R1, 11 May 2019).
8. The footing system and erosion protection system must in accordance with the
works detailed in the Tectonic report “Geotechnical Investigation, 54 Seaview
Terrace, Sunshine Beach”, (Reference 19078-003-Rev 0, 17 July 2020) and
other supporting documents referenced in the Tectonic report.
9. The design must include the protection of the northern and southern boundaries
of the site to prevent erosion on neighbouring properties exposing the side
boundaries of the site to erosion. The minimum extent of the side boundary
protection must be determined by a line drawn at 28° extending upwards to the
west from the base of the rear point of the erosion shown on Figure 8-3 of the
2019 Omtrek report “Working Notes: Mason v Noosa Shire Council - 54 Seaview
Terrace, Sunshine Beach”, (Reference J0033 R1, 11 May 2019).
10. The design must be accompanied by certification by a Registered Professional
Engineer of Queensland (RPEQ) specialising in geotechnical engineering that
the design is satisfactory and will provide a long-term factor of safety concerning
slope stability of no less than 1.5.
11. Following construction, certification must be supplied to Council by an RPEQ
specialising in geotechnical engineering that the works have been constructed
under the approved design.
12. A dilapidation survey shall be carried out of all adjacent properties before the
demolition of the existing dwelling on the site.
13. Due to the risk of instability on the existing dune slope and the potential for
settlement of loose sand on the adjacent properties, vibrations shall be kept to a
minimum and shall be monitored during the construction of the Detached House.
Driven piles (both sheet piles and pile footings) are not permitted on the site.
14. Landscaping at the rear of the property and the crest of the existing dune slope
shall be limited to a maximum surcharge of 5kPa unless a site-specific slope
stability analysis is carried out to demonstrate that higher loads are acceptable.
15. Under no circumstances shall building materials be temporarily stockpiled in the
area of the crest of the existing dune slope or on the slope.
16. Discharge of concentrated stormwater flows onto the dune slope shall be
avoided, and under no circumstances shall subsurface disposal of water be
permitted using infiltration pits.
17. Stormwater runoff from gutters, down-pipes, driveways, and paved areas shall
be collected and directed by pipes into the Council stormwater system along
Seaview Terrace. Where this is not possible, surface water should be directed
to infiltrate into the ground around the edges of hard surfaces, with infiltration
areas set back as far as possible from the crest of the dune slope.
18. The existing dune slope and any areas disturbed by the construction of the
proposed development shall be revegetated as soon as possible to reduce the
potential for erosion.
Page 16 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.