GENERAL COMMITTEE MEETING MINUTES 16 NOVEMBER 2020
12.3.7 All information must be prepared by a person with industry
experience in the successful establishment and/or re-
establishment of heathland vegetation. Industry and
educational institution involvement is recommended.
The establishment of the vegetation offsets for each stage must be
completed prior to the commencement of the use for each stage. The
Vegetation Clearing Offset program, required by these conditions,
must be implemented in a staged manner reflective of the approved
staging of the development. To this end separate Vegetation Clearing
Offset programs must be developed to reflect the staged delivery of
the development, in particular the staged development of lot 6, and
the subsequent development of lot 9.
12.4 No clearing is permitted unless in accordance with the approved
staged Vegetation Clearing Offset program.
14. The Vegetation Management operational works application must detail the
location and extent and staging of vegetation disturbance on Lot 9
SP252905 and Lot 6 RP901384 must be accurately marked on-site,
including any setback requirements for bushfire mitigation purposes, for
Council officers to inspect prior to commencement of any vegetation
clearing.
Bushfire
23. A bushfire evacuation plan for the site must be prepared by a qualified
person and submitted to Council prior to the issue of any Development
Permit for Operational Works.
CIVIL ENGINEERING
Frontage Works
33. Pedestrian crossings shall be provided in Grasstree Court generally as
shown on ‘Masterplan’ prepared by Thomson Adsett dated 15 October
2020, Plan Ref: DA_106 Rev. 3. The crossing shall include linemarking and
suitable signage in accordance with the MUTCD.
Vehicle Access
35. Vehicular access driveways to service the development shall be
constructed from the Grasstree Court frontages of the site. The driveways
shall be generally in accordance with Council’s standard drawing SEQ R-
051 and Masterplan’ prepared by Thomson Adsett dated 15 October 2020,
Plan Ref: DA_106 Rev. 3.
40. All internal roads shall be designed and constructed in accordance with
Council’s Planning Scheme Policy 5 – Engineering Design Standards –
Roads, Drainage and Earthworks. The roads shall be:
40.1 Generally in accordance with drawing number ‘Masterplan’ prepared
by Thomson Adsett dated 15 October 2020, Plan Ref: DA_106 Rev.
3,
40.2 A minimum width of 5.5 metres, and
40.3 Suitable for Council’s refuse collection vehicle to traverse through the
site
Page 7 of 17