GENERAL COMMITTEE MEETING MINUTES                                        16 NOVEMBER 2020


                         ii.    Where the field results and re-run MUSIC node demonstrate
                                the required pollution reduction efficiencies for the
                                development are not met, the applicant must implement
                                additional measures to achieve the required pollution reduction
                                targets. The additional measures must include, in order of
                                priority, elevated maintenance, and then increased treatment
                                capacity of the stormwater quality improvement devices.
                                Following application of additional measures, the system must
                                be retested in accordance with Stormwater Australia (2018)
                                Stormwater Quality Improvement Device Evaluation Protocol.
                                Version 1.2 December 2018. Where pollution reduction targets
                                continue to not be demonstrated the proprietary device must be
                                removed and replaced with a bio-retention device constructed
                                in accordance with an Operational Works approval or the
                                applicant must enter into an agreement with Council to provide
                                improved water quality outcomes within the catchment area.
                         iii.   A separate water quality performance bond must be provided
                                prior to the issue of an Operational Works approval for Civil
                                Infrastructure and Stormwater for Stage 1. The water quality
                                performance bond must be 150% of the cost of water quality
                                monitoring required to comply with Stormwater Australia (2018)
                                Stormwater Quality Improvement Device Evaluation Protocol.
                                Version 1.2 December 2018. The performance bond will be
                                incrementally returned annually for the value of monitoring
                                works completed that year. The full value of the bond shall be
                                returned upon demonstration that the development delivers the
                                required pollution reduction targets.
        C.   Delete condition 21.
        D.   Include the following advisory note on the development approval:
             1.     The developer is encouraged to liaise cooperatively with local community
                    groups to deliver and maintain the required glossy black food tree recovery
                    programme.
        DE. Note the report is provided in accordance with Section 63(5) of the Planning Act
            2016.
                                                                       Carried unanimously.


    2   MCU19/0134 PLANNING & ENVIRONMENT COURT APPEAL NO. D67 OF 2020 -
        REFUSAL OF AN APPLICATION FOR A BAR AT 5 TAYLOR COURT, COOROY
        Committee Recommendation
        Moved:           Cr Stockwell
        Seconded:        Cr Jurisevic
        That Council note the report by the Manager Development Assessment to the Planning
        & Environment Committee Meeting dated 10 November 2020 and:
        A.   aAgree to settle the Planning & Environment Court aAppeal No. D67 of 2020
             generally in accordance with the following conditions:
                    When Conditions Must Be Complied With
              1.    Unless otherwise stated, all works required by the conditions of this
                    Decision Notice must be completed prior to the use commencing, and then
                    compliance maintained at all times while the use continues.

                                                                                 Page 9 of 17
Log in to download the original file

2020-11-16 General Committee Minutes(PDF, 464KB).pdf · 475 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.