GENERAL COMMITTEE MEETING MINUTES 16 NOVEMBER 2020
ii. Where the field results and re-run MUSIC node demonstrate
the required pollution reduction efficiencies for the
development are not met, the applicant must implement
additional measures to achieve the required pollution reduction
targets. The additional measures must include, in order of
priority, elevated maintenance, and then increased treatment
capacity of the stormwater quality improvement devices.
Following application of additional measures, the system must
be retested in accordance with Stormwater Australia (2018)
Stormwater Quality Improvement Device Evaluation Protocol.
Version 1.2 December 2018. Where pollution reduction targets
continue to not be demonstrated the proprietary device must be
removed and replaced with a bio-retention device constructed
in accordance with an Operational Works approval or the
applicant must enter into an agreement with Council to provide
improved water quality outcomes within the catchment area.
iii. A separate water quality performance bond must be provided
prior to the issue of an Operational Works approval for Civil
Infrastructure and Stormwater for Stage 1. The water quality
performance bond must be 150% of the cost of water quality
monitoring required to comply with Stormwater Australia (2018)
Stormwater Quality Improvement Device Evaluation Protocol.
Version 1.2 December 2018. The performance bond will be
incrementally returned annually for the value of monitoring
works completed that year. The full value of the bond shall be
returned upon demonstration that the development delivers the
required pollution reduction targets.
C. Delete condition 21.
D. Include the following advisory note on the development approval:
1. The developer is encouraged to liaise cooperatively with local community
groups to deliver and maintain the required glossy black food tree recovery
programme.
DE. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
Carried unanimously.
2 MCU19/0134 PLANNING & ENVIRONMENT COURT APPEAL NO. D67 OF 2020 -
REFUSAL OF AN APPLICATION FOR A BAR AT 5 TAYLOR COURT, COOROY
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That Council note the report by the Manager Development Assessment to the Planning
& Environment Committee Meeting dated 10 November 2020 and:
A. aAgree to settle the Planning & Environment Court aAppeal No. D67 of 2020
generally in accordance with the following conditions:
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this
Decision Notice must be completed prior to the use commencing, and then
compliance maintained at all times while the use continues.
Page 9 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.