    8. Provide further information and amended plans that address the above
       issues.

A Waste Management Plan is included and describes the management of the onsite
waste. Further comment is also provided by SCG to confirm the manoeuvring of the waste
management vehicle.

    9. Provide amended plans that accurately depict fill levels (RL’s) for both
        existing and finished ground levels.
    10. Amend the development layout and drainage design so that a maintenance
        access ramp is provided from the internal driveway to the floor of the
        detention/bioretention basin.
    11. Provide an update to the SWMP which specifically examines the impact of
        the proposed increased discharge to Eumundi-Noosa Rd and shows that the
        roadway flow criteria of QUDM (Section 7.4) are still achieved in the road
        despite the increase. The analysis should be undertaken at the first side
        entry pit in the roadway.
    12. Provide an update to the SWMP which includes an allowance for climate
        change at year 2100 by incorporating a scenario for all results which is the
        1%AEP with rainfall intensities increased by 20%.

Please find attached SCG’s response to the items above.


Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. Please proceed with your assessment of the
application at your earliest convenience.

If you have any further queries in relation to the above, please do not hesitate to contact
myself.

Regards,




Jack Lewis B.Sc Hons UNSW M.Plan Otago MPIA MQELA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227




                                                                              Page 2 of 2


[OCR of page images]
8. Provide further information and amended plans that address the above
issues.

A Waste Management Plan is included and describes the management of the onsite
waste. Further comment is also provided by SCG to confirm the manoeuvring of the waste
management vehicle.

9. Provide amended plans that accurately depict fill levels (RL’s) for both
existing and finished ground levels.

10. Amend the development layout and drainage design so that a maintenance
access ramp is provided from the internal driveway to the floor of the
detention/bioretention basin.

11. Provide an update to the SWMP which specifically examines the impact of
the proposed increased discharge to Eumundi-Noosa Rd and shows that the
roadway flow criteria of QUDM (Section 7.4) are still achieved in the road
despite the increase. The analysis should be undertaken at the first side
entry pit in the roadway.

12. Provide an update to the SWMP which includes an allowance for climate
change at year 2100 by incorporating a scenario for all results which is the
1%AEP with rainfall intensities increased by 20%.

Please find attached SCG’s response to the items above.
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. Please proceed with your assessment of the

application at your earliest convenience.

If you have any further queries in relation to the above, please do not hesitate to contact
myself.

Regards,

Jack Lewis 8.sc Hons UNSW M.Plan Otago MPIA MQELA
Planner/Director

Pivotal Perspective Pty Ltd

0406 334 227

Page 2 of 2

Log in to download the original (response to further advice.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.