8. Provide further information and amended plans that address the above
issues.
A Waste Management Plan is included and describes the management of the onsite
waste. Further comment is also provided by SCG to confirm the manoeuvring of the waste
management vehicle.
9. Provide amended plans that accurately depict fill levels (RL’s) for both
existing and finished ground levels.
10. Amend the development layout and drainage design so that a maintenance
access ramp is provided from the internal driveway to the floor of the
detention/bioretention basin.
11. Provide an update to the SWMP which specifically examines the impact of
the proposed increased discharge to Eumundi-Noosa Rd and shows that the
roadway flow criteria of QUDM (Section 7.4) are still achieved in the road
despite the increase. The analysis should be undertaken at the first side
entry pit in the roadway.
12. Provide an update to the SWMP which includes an allowance for climate
change at year 2100 by incorporating a scenario for all results which is the
1%AEP with rainfall intensities increased by 20%.
Please find attached SCG’s response to the items above.
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. Please proceed with your assessment of the
application at your earliest convenience.
If you have any further queries in relation to the above, please do not hesitate to contact
myself.
Regards,
Jack Lewis B.Sc Hons UNSW M.Plan Otago MPIA MQELA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227
Page 2 of 2
[OCR of page images]
8. Provide further information and amended plans that address the above
issues.
A Waste Management Plan is included and describes the management of the onsite
waste. Further comment is also provided by SCG to confirm the manoeuvring of the waste
management vehicle.
9. Provide amended plans that accurately depict fill levels (RL’s) for both
existing and finished ground levels.
10. Amend the development layout and drainage design so that a maintenance
access ramp is provided from the internal driveway to the floor of the
detention/bioretention basin.
11. Provide an update to the SWMP which specifically examines the impact of
the proposed increased discharge to Eumundi-Noosa Rd and shows that the
roadway flow criteria of QUDM (Section 7.4) are still achieved in the road
despite the increase. The analysis should be undertaken at the first side
entry pit in the roadway.
12. Provide an update to the SWMP which includes an allowance for climate
change at year 2100 by incorporating a scenario for all results which is the
1%AEP with rainfall intensities increased by 20%.
Please find attached SCG’s response to the items above.
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. Please proceed with your assessment of the
application at your earliest convenience.
If you have any further queries in relation to the above, please do not hesitate to contact
myself.
Regards,
Jack Lewis 8.sc Hons UNSW M.Plan Otago MPIA MQELA
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227
Page 2 of 2
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (response to further advice.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.