4. ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
TJS-04865-01 A Site Plan & Water Allocation prepared 5 October 2023
by EDGE Consulting Engineers
TJS-04865-02 A Layout Plan prepared by EDGE 5 October 2023
Consulting Engineers
TJS-04865-03 A Elevation prepared by EDGE 5 October 2023
Consulting Engineers
TJS-04865-04 A Foam Details, Ally Flat Deck Type 5 October 2023
prepared by EDGE Consulting
Engineers
JSP-GW-006 M Standard Catwalk Construction 14 January 2021
prepared by EDGE Consulting
Engineers
JSP-SD-102-1 A Pile Bracket Construction to Suit 315 23 September 2019
Piles & 6 Roller Bracket prepared by
EDGE Consulting Engineers
JSP-SD-045 E Concrete Insitu Pile Construction 315 9 September 2020
& 400 Diameter Reinforced prepared
by EDGE Consulting Engineers
JSP-SD-212 D FRP Reinforced Pontoon 9 September 2020
Construction Standard Flat Deck and
Float a Boat Pontoons prepared by
EDGE Consulting Engineers
Currency Period
2. The Currency Period for this development approval lapses if all conditions have not been
complied with, and the plan of survey lodged with Council for endorsement by 28 May 2026,
unless an application to extend the currency period is approved by Council.
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
commencement of the works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of this approval less any costs incurred by Council in respect
of enforcing performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
General Conditions
4. All elements of the existing jetty, both above and below water level, must be wholly removed
as part of these works.
Page 2 of 15
Document Set ID: 23038802
Version: 2, Version Date: 30/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ECM_23038802_v2_Decision Notice - Approved by Delegation of Authority MCU24 0044 & OPW24 0045.pdfRelated documentApplication case desk ↗
About this file
- File size
- 697 KB (small file)
- File type
No other editions are linked here.