Council archive · source document
ECM_23038802_v2_Decision Notice - Approved by Delegation of Authority MCU24 0044 & OPW24 0045 · MCU24/0044
2404-40124 SRA
Attachment 1—Referral agency conditions
{Under section 56[1)(D)()) of the Planning Act 2076 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. | Conditions | Condition timing
Operational works
Schedule 10, Part 17, Division 3, Table 1, Item 1 — Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Environment and Science to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
1. The development must be carried out generally in accordance with —_| For the duration of
the following plans: works and to be
« Layout plan, prepared by The Jetty Specialist, dated maintained.
06/03/2024, drawing number TJS-04865-02, revision A.
¢ Elevation, prepared by The Jetty Specialist, dated
06/03/2024, drawing number TJS-04865-03, revision A.
2. The works to which this approval relates are to be for a private Atall times.
purpose only.
3. Any operator and contractor involved in the works to which this During construction.
approval relates must:
a) be provided a copy of referral agency conditions
b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval
¢) maintain such measures, plant and equipment in a proper
and efficient condition
d) operate such measures, plant and equipment in a proper
and efficient manner.
4. For the proposed works only use material which are free from During construction.
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
5. Should the works become damaged as a result of erosion, flooding Atall times.
or storm tide inundation, the registered landowner(s) of the subject
land shall be responsible for the removal of all debris at their own
expense.
Schedule 10, Part 17, Division 3, Table 2, Item 1 — Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
6. The development must be carried out generally in accordance with Atall times.
the following plans:
* Site Plan and Water Allocation, prepared by The Jetty
Specialist, dated 22/11/23, drawing number TJS-04865-01,
revision A.
7. a) Light/mark all vessels, structure, plant and equipment associated | For the duration of
with the works, in accordance with Section 3 of AS4282-1997 work and for operation
Control of the obtrusive effects of outdoor lighting. to be maintained at all
b) Lighting provided must not obscure, disguise or otherwise
interfere with the safe navigation of other vessels, including the
effectiveness of navigational lighting.
‘State Assessment and Referral Agency Page 3 of 7
Document Set ID: 23038802 Page 8 of 15
Version: 2, Version Date: 30/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ECM_23038802_v2_Decision Notice - Approved by Delegation of Authority MCU24 0044 & OPW24 0045.pdfRelated documentApplication case desk ↗
About this file
- File size
- 697 KB (small file)
- File type
No other editions are linked here.