ECM_23038802_v2_Decision Notice - Approved by Delegation of Authority MCU24 0044 & OPW24 0045 · MCU24/0044
2404-40124 SRA 8. The construction, operation and maintenance of the pontoon and For the duration of any ship berthed, moored or attached to the structure, must not: works, and at all times. a) encroach into, pass over or under a navigation corridor; or b) be located in a high risk maritime zone; or c) impede the safe navigation of other ships or boats; or d) restrict safe access to or from neighbouring structures 9. Remove and dispose of any debris or similar obstruction For the duration of encountered whilst undertaking the work at an appropriately licensed | works. facility. 10. All piles and/or structure to be demolished, both above and below Prior to the completion the waterline must be completely extracted/removed. of works. State Assessment and Referral Agency Page 4 of 7 Document Set ID: 23038802 Version: 2, Version Date: 30/05/2024 Page 9 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ECM_23038802_v2_Decision Notice - Approved by Delegation of Authority MCU24 0044 & OPW24 0045.pdfRelated documentApplication case desk ↗
About this file
- File size
- 697 KB (small file)
- File type
No other editions are linked here.