3.0 PROPOSED DEVELOPMENT
The proposed development consists of multi storey hotel buildings with basement carparking
and all buildings to be surrounded by extensive landscape areas, both hard and soft. The
northern face of the development provides for two (2) swimming pools; one at the eastern end of
the site surrounded by hardstand and landscaping and a second ‘quiet pool’ at the western end
of the site with predominantly soft-landscaped surrounds.
An ephemeral stream will provide a suitable route for conveyance of external catchment flows
through the site with minor events piped and emergency major event flows conveyed as
overland flow.
Guests’ vehicular entry to basements will be from Banksia Avenue while service vehicles will
access back of house areas via the cul-de-sac bowl at the end of Serenity Close.
Refer architectural drawings at Appendix C.
4.0 COUNCIL CONDITIONS
46. Stormwater Drainage
1. Prior to the lodging of a development application for Operational Works, provide and
have endorsed by Council updated architectural plans, preliminary engineering plans,
and Stormwater Management Plan, which addresses the following:
a. Acceptance of all external catchments
b. Provide sizing and nominate the locations of roofwater harvesting tanks. The tanks
are to be sized to provide 80% reliability to supply water for landscape irrigation
and flushing of toilets in public/communal areas of the resort
c. Provide a method of removal of gross pollutants from all surface runoff (eg litter
baskets)
d. Provide treatment of internal site runoff such that the pollutant removal
requirements of AO6.1 and AO6.2 of the Water Quality and Drainage Code are
achieved prior to discharge to surface waters or infiltration to groundwater. Provide
MUSIC modelling to demonstrate this will be achieved by the proposed stormwater
treatment train
e. Provide in-situ hydraulic conductivity testing at the locations and depths nominated
for Rapid Infiltration Pits and demonstrate that the assumptions regarding
infiltration rates will be achieved. If not achievable, provide a revised design.
f. Ensure the proposed method of stormwater management achieves no net
reduction of rainwater infiltrating the sand dunes beneath the site. This may be
achieved either by infiltrating all flows up to the 10%AEP or by alternative
measures designed and managed in accordance with a groundwater recharge and
discharge management plan prepared by a suitably experienced and qualified
groundwater hydrologist. The groundwater recharge or discharge must
demonstrate that the development does not affect groundwater balances beyond
the property boundaries.
g. Updated the maintenance and management plan of the Stormwater Management
Plan to reflect any changes.
__________________________________________________________________________
A6769/25/SWMP/Rev OpW(A) – Feb 2025
SH/PL Page 2 of 9
Brah101 Pty Ltd t/as ALTA PROJECTS
Document Set ID: 23646596
Version: 1, Version Date: 21/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Approved Plans & Document OPW25-0042.pdfRelated documentApplication case desk ↗
About this file
- File size
- 36.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.