Skip to the record
The gold standard in government transparency.

Council archive · source document

SUPERSEDED Approved Plans & Document OPW25-0042 · OPW25/0042

of 91

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (36.5 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 40, section 1. The text section number identifies this passage in the reader.

                     Quality Modelling has been undertaken using the ‘split catchment’ method.
                     The Rainfall Runoff Parameters for the source catchments have been taken
                     from table 3.7 of Water By Design’s – MUSIC Modelling Guidelines, Version 1.0
                     2010 and are shown in Table 8.1 below.



                                   Pervious Area Properties

                                       Soil Storage Capacity (mm)                         18

                                       Initial Storage (% of Capacity)                    10

                                       Field Capacity (mm)                                80

                                       Infiltration Capacity Coefficient ‘a’              243

                                       Infiltration Capacity Exponent ‘b’                 0.6

                                   Groundwater Properties

                                       Initial Depth (mm)                                 50

                                       Daily Recharge Rate (%)                            0

                                       Daily Baseflow Rate (%)                            31

                                       Daily Deep Seepage Rate (%)                        0

                                       Rainfall Threshold (mm)                            1


                     Table 8.1: Rainfall Runoff Parameters & Pervious Area Properties

                     The pollutant load concentrations for each source catchment have been taken
                     from Table 3.8 of the Water by Design MUSIC Modelling Guidelines Version 1.0,
                     2010 using the concentrations recommended for Urban Residential areas.

                     The model was run for an average rainfall recorded at Cooroy Rainfall Station
                     using a 6 minute time step.

                     Please refer to the electronic MUSIC model attached at Appendix J.




                     __________________________________________________________________________

                     A6769/25/SWMP/Rev OpW(A) – Feb 2025
                                                                                                  Page 17 of 9
                     SH/PL
                                                     Brah101 Pty Ltd t/as ALTA PROJECTS
Document Set ID: 23646596
Version: 1, Version Date: 21/03/2025

Used in these records

About this file

File size
36.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Approved Plans & Document OPW25-0042.pdf · 36.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.