Skip to the record
Noosa’s premier civic archive.

Council archive · source document

SUPERSEDED Approved Plans & Document OPW25-0042 · OPW25/0042

of 91

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (36.5 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 41, section 1. The text section number identifies this passage in the reader.

                     8.2 QUALITY MUSIC MODEL RESULTS


                     The results of the Quality MUSIC model are shown in Table 8.2 below.


                                                     Flow         TSS         TP           TN              Gross
                                                     ML/y         Kg/y        Kg/y         Kg/y            Pollutant
                                                                                                           Kg/y
                              Source Load            19.32        1035        3.825        40.27           414.6
                              Residual Load          14.86        181.2       1.239        19.48           0
                              % Reduction            23.06        82.48       67.6         51.62           100
                              %Target Reduction -                 85          60           45              90



                               Table 8.2 Treatment Train Effectiveness



                     Inspection of Table 8.2 shows that the target pollutant load reductions will be
                     achieved for the developed site.




                     9.0 SYSTEM MAINTENANCE

                     RIPs/RICs, bioretention basins and the rainwater harvesting tank will be
                     subject to routine inspection and maintenance by the hotel’s maintenance
                     team and such maintenance is critical to their ongoing function.

                     Failure to carry out such maintenance could result in system failures,
                     environmental harm and surcharge of infiltration pits and culverts.

                     A recommended maintenance schedule for elements of the water quality
                     treatment and train and infiltration devices appears at Appendix F.
                     __________________________________________________________________________

                     A6769/25/SWMP/Rev OpW(A) – Feb 2025
                                                                                                       Page 18 of 9
                     SH/PL
                                                 Brah101 Pty Ltd t/as ALTA PROJECTS
Document Set ID: 23646596
Version: 1, Version Date: 21/03/2025

Used in these records

About this file

File size
36.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Approved Plans & Document OPW25-0042.pdf · 36.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.