Council archive · source document
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published] · 142010.632
Brig fe Te dete eit e téd.for comm C] No |* Adevetopment permit is required * Your application must include Removal of quarry material from a watercourse—IDAS form 18 ¢ This application requires assessment by the Department of Environment and Resource Management (DERM). If DERM is not the assessment manager for your application, the role of the agency will be as a concurrence agency and you must provide a copy of the application to DERM | No |* Adevelopment permit is required * Your application must include Removal of quarry material from a watercourse-IDAS form 18 ¢ This application requires assessment by the Department of Environment and Resource Management (DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency and you must give DERM a copy of the application [] Yes 3 Development application assessment checklist—IDAS checklist 1 Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.