Skip to the record
The only place to find full transcripts.

Council archive · source document

10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published] · 142010.632

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

  

 

Brig fe Te dete eit
e téd.for comm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C] No |* Adevetopment permit is required
* Your application must include Removal of quarry material from a watercourse—IDAS form 18

¢ This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for your application, the role of the agency will be as a concurrence
agency and you must provide a copy of the application to DERM

 

 

 

 

 

 

 

| No |* Adevelopment permit is required
* Your application must include Removal of quarry material from a watercourse-IDAS form 18

¢ This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application

 

 

 

 

[] Yes

 

 

3 Development application assessment checklist—IDAS checklist 1
Version 1.0 18 December 2009

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.