Council archive · source document
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published] · 142010.632
OO0 -
nt wi
-2:35ls the developme it:
| Yes |« Adevelopment permit is required
« Your application must include Removal of quarry material from a watercourse—IDAS form 18
¢ This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must give DERM a copy of the application
| No ¢ Prohibited development. A development application for this development cannot be made
Section reference:
« Sustainable Planning Regulation, schedule 3, part 1, table 5, item 1
« Sustainable Planning Regulation, schedule 7, table 2, item 12
e Sustainable Planning Act 2009, schedule 1, item 2
-Qlieensiand heritage place
iption certificate for the propos:
oes
pment.l
tt ga!
Tae
|. deve
ee
[_] Yes |« Adevelopment permit is not required for this aspect of the development
[] No J+ Adevelopment permit is required
« Your application must include Queensland heritage place—IDAS form 3
© This application requires assessment by the Department of Environment and Resource Management (DERM).
If DERM is not the assessment manager for the application, the role of the agency will be as a concurrence
agency and you must provide a copy of the application to DERM
C] Yes |» Adevelopment permit is not required for this aspect of the development
4 Development application assessment checklist—IDAS checklist 1
Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.