Skip to the record
Accept no substitutions.

Council archive · source document

10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published] · 142010.632

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

   

PLANNING SCHEME ae _— SoS, ee ke

44 ls the proposed operational work assessable under any State planning regulatory provisions?

X}No [] Yes

If no, is the proposed operational work assessable under the planning scheme?
EX] No - Goto nae [] Yes - Compteie Form i, Pant E and answer Qs 1.1 - 4.1 7 below

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL OEVELOPMENT IN.A WILD RIVER
AREA foes .

4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?

XJ No -Gomor3s [7] Yes

 

   

KOALA CONSERVATION (Inisidé SEQ urban footpririt)

 

4.3A Is any part of the premises in an interim koala habitat protection area?
Bq No -Getooa3a [7] Yes

VEGETATION CLEARING; KOALA CONSERVATION

 

4.38 Is any of the proposed operational work for the clearing oft native vegetation to which the Vegetation Management Act 1999
applies?

No -Gotoa44 ((] Yes

    

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA Mea EE =

44 's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000. section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

&X No - Goto 04.5 | Yes - Answer fa) and (b} below

     

45 \s any of the proposed operational work for any thing constructed cr installed that allows, under the Water Act 2000, for taking or
interfering vith artesian water (other than using a water truck to pump water)?

X No Gu to 04.6 Ct) Yes - (Complete Fon 1. Part K,) This application requires assessment by the Department of Natural Resources and Waler
INRW) HENRY Wis net ihe Assessment nt Manager for ihe apontication, the agene y has jurisdiction as Concurrence Agency.

  

   

46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for taking
overland flow water (other than using a water truck to pump water}?
IX} No -Gotoat7 [7] Yes - Answer fa) and (b} below

tyes dene pba.

     

47 Is any of the proposed operational work for any thing constructed or installed that allows. under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?

x] No -Gocoag [[] Yes

 

48 Does any of the proposed operational work for any thing constructed or installed that allows. under the Water Act 2000, far
interfering with overland flow water (olher than using a water truck to pump water)?

IX] No -satnong [7] Yes - Answer inna (a) and (b} below

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.