Council archive · source document
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published] · 142010.632
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
PLANNING SCHEME ae _— SoS, ee ke
44 ls the proposed operational work assessable under any State planning regulatory provisions?
X}No [] Yes
If no, is the proposed operational work assessable under the planning scheme?
EX] No - Goto nae [] Yes - Compteie Form i, Pant E and answer Qs 1.1 - 4.1 7 below
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL OEVELOPMENT IN.A WILD RIVER
AREA foes .
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
XJ No -Gomor3s [7] Yes
KOALA CONSERVATION (Inisidé SEQ urban footpririt)
4.3A Is any part of the premises in an interim koala habitat protection area?
Bq No -Getooa3a [7] Yes
VEGETATION CLEARING; KOALA CONSERVATION
4.38 Is any of the proposed operational work for the clearing oft native vegetation to which the Vegetation Management Act 1999
applies?
No -Gotoa44 ((] Yes
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA Mea EE =
44 's any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000. section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
&X No - Goto 04.5 | Yes - Answer fa) and (b} below
45 \s any of the proposed operational work for any thing constructed cr installed that allows, under the Water Act 2000, for taking or
interfering vith artesian water (other than using a water truck to pump water)?
X No Gu to 04.6 Ct) Yes - (Complete Fon 1. Part K,) This application requires assessment by the Department of Natural Resources and Waler
INRW) HENRY Wis net ihe Assessment nt Manager for ihe apontication, the agene y has jurisdiction as Concurrence Agency.
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for taking
overland flow water (other than using a water truck to pump water}?
IX} No -Gotoat7 [7] Yes - Answer fa) and (b} below
tyes dene pba.
47 Is any of the proposed operational work for any thing constructed or installed that allows. under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
x] No -Gocoag [[] Yes
48 Does any of the proposed operational work for any thing constructed or installed that allows. under the Water Act 2000, far
interfering with overland flow water (olher than using a water truck to pump water)?
IX] No -satnong [7] Yes - Answer inna (a) and (b} below
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.