Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

10/0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published] · 142010.632

of 46

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED FLANMING ACT 1997 IDAS Assessment Checklist. Version 22

. be
49 Is the proposed operational work for the following?
og — ; — _ —— _—
() For the construction of a referable dam as defined under the Wafer Supply (Safety and Reliability) RM No 1 Yes
Act 2008 a
(ii) To increase the storage capacity of a referable dam by more than 10% & No [] Yes

Rescurces and
iction as

 
 

\f yes to either or both (i) or {ii} above - ‘Complete For 1, Part Ks) Thus application requires assessment by ihe Department of Natur
Water (NEW). NRW is not ihe Assessment Manager for the application, the agency has j
Concurrence Agency

TIDAL WORK; WILD RIVER AREA
4.40 Is any of the proposed operational work tidal work, other than excluded work defined under the [PA?
oO No - Goto 04.11 Yes - Answer (a) and /h) below
(a) Is any of the proposed tidal work prescribed tidal work?
iJ Yes [-] No

If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?

J No [] Yes
if no, is the work proposed in a canal?
XJ No .[] Yes

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

ins

& No - (Complete Form 1, Part P). Ifthe Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensiand Transport (Maritime Safety Qld) as Concurrence Agency.

O Yes - (Compleie Form 1, Part P}. if the Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport {Maritime Safety Qld} as Concurrence Agency
and Qld Fire and Rescue Service as Advice Agency.

(b} Is any of the proposed tidal work to be carried out in one or more of the following tidai areas?

(i) One only local government tidal area L_] No Yes -

ii Starting in one local government tidal area and extending into another local

" covernment tidal rea (but in no strategic port tidal area) Dx] No [] Yes

(iil) In two or more local government tidal areas but not starting in either local §] No CT] Yes
government tidal area

(iv) One only strategic port tidal area (J No [] Yes

(v) A tidal area that is not a strategic port tidal area or a local government tidal Bq No Cl Yes
area

Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.

hy Pde EE awe

    

COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA

yes Bi

4.44 !s any of the operational work proposed to be carried out within a coastal management district?

EX] No -Gotoor12 [7] Yes

t pe heat OP baths

 

Vote hy thes

WATERWAY BARRIER WORKS: WILD RIVER AREA

4.42 ‘s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?

BX No -Gotooe:3 (7) Yes

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0632 - Prescribed Tidal Works - Pontoon - Gympie Tc [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.