Original source · versioned page text
Attachment 9 - Traffic Engineering Report
accounted for in the above survey. Following the relocation of the clubhouse, these vehicles will be diverted into the subject site; as opposed to being ‘New Trips’. 6.3 Future Base Traffic Volumes To estimate future traffic demands in the absence of the proposed development, a conservative annual average compound traffic growth rate of 2.0% has been applied to the 2019 surveyed traffic volumes to obtain both opening year (2024) and 10-year design horizon (2034) demands. This growth rate is based on Council’s current population estimates of the expected growth within the Cooroy catchment, as well as historical traffic growth on Myall Street over the last 10-years (as indicated from DTMR’s AADT data for traffic count site 20049). TTM has identified three assessment periods for the road network as follows: Current Traffic Scenario This scenario includes the 2019 traffic volumes modelled over the existing road network. This analysis has been performed for both the AM and PM peaks. Opening Year (2024) Traffic Scenario This analysis incorporates a 2.0% per annum increase in the background traffic volume for a period of 5 years from the most recent survey. This analysis has been performed for both the AM and PM peaks at the Myall Street/ Site Access intersection and the Myall Street/State Route 6/Nandroya Road Roundabout Intersection. 2034 Traffic Scenario This analysis incorporates a 2.0% per annum increase in the background traffic volume for a period of (10 years past opening year). This analysis has been performed for both the AM and PM peaks at the Myall Street/ Site Access intersection. 6.4 Development Traffic 6.4.1 Estimated Development Traffic Generation 6.4.1.1 Relocatable Dwellings – New Trips In order to more accurately predict the levels of traffic generation associated with the relocatable dwelling aspects of the proposed development, TTM have integrated the results of previously undertaken traffic surveys at the access/egress points of an existing relocatable dwelling development. The existing development was of comparable scale and similarly situated in proximity to the nearby township. The surveys were undertaken on the 18th July 2019 and reflected an AM peak hour generation rate of 0.189vph/dwelling and PM peak hour generation rate of 0.124vph/dwelling. The surveys indicated that 50% of vehicles were inbound in the AM peak hour period, with the remaining 50% outbound. 60% of vehicles were surveyed to be travelling inbound in the PM peak hour period with the remaining 40% travelling outbound. Site: Lot 2 & 3 Myall Street, Cooroy 18 Reference: 19BRT0357
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.