Attachment 9 - Traffic Engineering Report
7 Road Network Performance
7.1 Myall Street / Site Access Assessment
7.1.1 Turn Lane Warrant Analysis
A turn lane warrant analysis has been undertaken in accordance with DTMR’s Supplement to Austroads
Guide to Road Design Part 4A: Unsignalised and Signalised Intersection (Aug 2014) to determine if turn
treatment upgrades are required as a result of the proposed development.
Table 7.1 details the parameters and turn lane treatment types required at the proposed development site
access based on the estimated 2034 peak hour traffic volumes.
Table 7.1: Turn Lane Warrant Assessment – Myall Street / Site Access Intersection
Approach Scenario AM Peak Hour PM Peak Hour
Q R/L QM Treatment Q R/L QM Treatment
Right Turn-in 2034 Project 18 1335 CHR(s) 6 1116 CHR(s)
Left Turn-in 2034 Project 72 671 AUL / CHL 33 534 AUL (s)
The assessment indicates that the proposed development site access requires a channelised right turn lane
treatment (CHR(s)) and a channelised or auxiliary left turn lane treatment (AUL / CHL). A preliminary review
indicates that the required treatments can be accommodated within the existing road reserve.
7.1.2 SIDRA Analysis
The required access intersection configuration has been analysed for the 2024 and 2034 traffic volume
scenario. Figure 7.1 shows the modelled intersection configuration with the proposed turn treatments.
Figure 7.1: Proposed Myall Street / Site Access Intersection Layout
Site: Lot 2 & 3 Myall Street, Cooroy 24
Reference: 19BRT0357
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.