Original source · versioned page text
Attachment 9 - Traffic Engineering Report
9 Summary and Conclusions 9.1 Development Summary The proposed development scheme involves a relocatable home park consisting of 232 lots (with the lots measuring 14m x 21m) and the construction of a new Cooroy Golf Club clubhouse. The development also consists of a relocatable sale showroom, managers workshop and clubhouse (with indoor & outdoor pools, residents workshop and lawn bowls facilities). 9.2 Car Parking Arrangements It is proposed that all residential parking required for the relocatable dwellings be accommodated within the enclosed garages provided within each lot. It is noted that a performance solution has been proposed for the visitor and residential surplus parking, detailed within Section 4.1. The proposed parking supply for the golf club clubhouse satisfies NSC accepted parking requirements. Overall, the proposed car parking arrangements for this development are adequate. The proposed design layout satisfies NSC’s design standards and is suitable for the development. 9.3 Site Access Arrangements The development scheme proposes an 11m wide crossover to Myall Street, which will facilitate access to both the relocatable dwellings and the Cooroy golf clubhouse. Additionally, the development proposes the construction of an emergency vehicle access crossover to Nandroya Road. The design of these crossovers is generally in accordance with NSC requirements with both crosssovers ideally positioned in terms of intersection/driveway separation and sight distance requirements. As detailed in Section 7, a turn lane warrant analysis has been undertaken which indicates that in the 10-year design horizon (2034) scenario, the proposed development site access requires a channelised right turn lane treatment (CHR(s)) and a channelised or auxiliary left turn lane treatment (AUL / CHL). Overall, TTM consider the access arrangements to adequately cater for the practical demands of the proposed development. 9.4 Service Vehicle Arrangements Servicing for this development will be facilitated within the circulation aisles, accessed off Myall Street. The largest design vehicle, a 12.5m HRV, can manouevre within the site ultimately entering and exiting in a forward gear. Regarding the servicing arrangements of the Cooroy golf clubhouse, a loading bay suitable for vehicles up to the size of a HRV has been provided adjacent to the building. Site: Lot 2 & 3 Myall Street, Cooroy 29 Reference: 19BRT0357
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.