Attachment 9 - Traffic Engineering Report
Overall, the proposed service vehicle arrangements are considered adequate to meet the needs of the proposed development. 9.5 Active Transport Facilities The current public transport infrastructure and proposed site provisions for pedestrian/bicycle facilities is considered adequate for the development. 9.6 Impact on Surrounding Road Network Assessment of the proposed development indicates that the development will not have a significant impact on the future road network. As such, no mitigating road works are required beyond the warranted turn treatments 9.7 Conclusion Based on the assessment contained within this report, TTM see no traffic engineering reason why the relevant approvals should not be granted. Site: Lot 2 & 3 Myall Street, Cooroy 30 Reference: 19BRT0357
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.