GENERAL COMMITTEE MEETING AGENDA 26 MAY 2014 REPORTS TO GENERAL COMMITTEE 1. APPLICATION FOR OPERATIONAL WORKS – EARTHWORKS SITUATED AT 26 EXHIBITION STREET, POMONA – FURTHER REPORT Author Senior Engineering Officer – Mark Lewis Planning and Infrastructure Index ECM: Subject/ Operational Works & Application/ OPW13/0830 Attachments Nil EXECUTIVE SUMMARY Not applicable. RECOMMENDATION That Council approve Application No. OPW13/0830 for a Development Permit for Operational Works – Earthworks and Stockpile for Repairs situated at 26 Exhibition Street, Pomona in accordance with the following Conditions of Approval: 1. The applicant must provide a “Flood Impact Assessment” of the filling placed on site. *(Refer to Advisory Note) The assessment must: (a) be prepared by a suitably qualified professional engineer, (b) have regard to Council’s Pomona Flood Study, and (c) clearly indicate the extent of any off-site impacts. Should the assessment conclude that offsite impacts will occur, recommendations must be included in the ‘Flood Impact Assessment’ detailing any necessary remedial works. 2. The applicant must undertake any necessary remediation works included in the recommendations of the required “Flood Impact Assessment”. Remediation works may include, but not be limited to, removal of fill and/or reshaping surface levels. 3. The applicant must provide a landscape rehabilitation plan, based the findings of the “Flood Impact Assessment”, that provides compensatory habitat along the batters of the fill to offset habitat lost. The compensatory habitat must provide habitat features for local threatened frog species. 4. The landscape rehabilitation plan must be submitted to Council for approval within 2 months of this notice. 5. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244. The pre-start meeting must include the relevant parties for the following aspects of the works: (a) Earthworks; (b) Landscaping and/or rehabilitation 6. All unsuitable materials and other waste must be removed from the fill. 7. All fill and associated batters must be contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. Page 4 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.