GENERAL COMMITTEE MEETING AGENDA 26 MAY 2014
8. The batters of the existing fill must be regraded such that that are a maximum grade of:
(a) 1 in 6 where in proximity to waterbodies
(b) 1 in 4 for grassed areas.
(c) 1 in 3 for planted areas
9. No further filling, excluding the repairs to the existing surface, is to be undertaken on the
site without Council approval.
10. No further disturbance of the riparian vegetation, unless for ecological restoration works, is
to be undertaken on the site without Council approval.
11. All stockpiles of fill material must be located above the 1%AEP flood level.
12. All exposed or disturbed surfaces must be suitably stabilised as soon as is practicable after
works have been completed. *(Refer to Advisory Note)
13. Where damage occurs to any council asset as a result of the development works, it must
be repaired immediately where it creates a hazard that presents risk to person or property.
Other damage must be repaired prior to completion of works.
14. All works must be completed within 12 months from the date that this permit takes effect.
ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
General Advisory Notes
1. In regard to the required “Flood Impact Assessment” Council will provide access to the
current data relating to flood modeling within the Pomona township.
2. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the
site safe due to inactivity on the development site for extended periods of time.
3. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Sustainable
Planning Act 2009 must be made. Amended plans clearly indicating the changes must be
lodged with this application along with the appropriate fees.
Prestart Meeting Request
4. Contact Council on 5329 6244 to arrange a prestart or an inspection giving a minimum of 5
business days notice of preferred inspection time.
Erosion and Sediment Control
5. Accepted best practice standards include:
(a) the Sunshine Coast Regional Council Manual for Erosion and Sediment Control
V1.2 or other superseding document subsequently adopted by Council;
(b) Best Practice Erosion and Sediment Control, International Erosion Control
Association (2008)
6. As a general rule, a site is determined to have achieved effective short-term stabilisation if
at the completion of the works:
I. Methods of stabilisation are:
appropriate for slopes and slope lengths; and
are consistent with best practice environmental management practices such as in
the Manual for Erosion and Sediment Control or the IECA Manual; and
II. Stormwater runoff from the site is not currently, and is not likely to result in visible
evidence of sedimentation or erosion, or lead to water contamination.
Page 5 of 33