2018-01-15 GC Agenda - Attachment 1 to Item 6 - P&E Court Appeal 344 of 2009
barrier only.
REFERENCED DOCUMENTS
Not Applicable.
ADVISORY NOTES
PLANNING
Nature and Extent of Approved Development
1. The applicant is advised that this development approval comprises:
Reconfiguring a Lot for 52 lots and Park.
Infrastructure Charges
2. This Development Permit may trigger an “Adopted Infrastructure Charge Notice” (if
applicable) to be issued in accordance with Council’s “Adopted Infrastructure
Charges Resolution” under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
Road Naming Procedure
3. Road names must be approved by Council before a subdivision plan is submitted for
compliance assessment and signing. A written request for proposed naming of roads
must be submitted to Council together with a plan of the proposed roads and a
completed road naming application form. Further details can be found on Council’s
website.
ENGINEERING
Building and Construction Industry (Portable Long Service Leave) Levy
4. From 1 January 2000, the Building and Construction Industry (Portable Long Service
Leave) Levy must be paid prior to the issue of a development permit where one is
required for the 'Building and Construction Industry'. This applies to Building Works,
Operational Works and Plumbing and Drainage Works applications, as defined under
the Sustainable Planning Act 2009, where the works are $80,000 or more and
matching the definition of 'Building and Construction Industry' under the Building and
Construction Industry (Portable Long Service Leave) Act 1991. Council will not be
able to issue a Decision Notice without receipt of details that the Levy has been paid.
Should you require clarification in regard to the amendments to the Building and
Construction Industry (Portable Long Service Leave) Act 1991, you should contact
QLeave on 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
5. To assist Council to undertake an integrated assessment of the operational works
application, all aspects of the works must be included in one (1) application and be in
accordance with Council’s planning scheme. Additional application fees apply to
applications where the different aspects of the works are lodged separately.
Significant savings in application fees will result if all works are lodged in a single
application.
Preparation of a Preliminary Construction Management Plan
6. The works identified in this Decision Notice will be required to be carried out in
accordance with a Construction Management Plan endorsed by Council through an
approval for Operational Works. To ensure expedient assessment of any
Operational Works application, the applicant is advised to submit a preliminary
Construction Management Plan that addresses the requirements of the planning
scheme. In particular, the preliminary Construction Management Plan should
address the following:
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.