2018-01-15 GC Agenda - Attachment 1 to Item 6 - P&E Court Appeal 344 of 2009
(a) traffic management during all aspects of the construction phase including:
(i) a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction;
(ii) maintenance of safe access along Hollett Road both during daily
construction and after daily construction has ceased;
(iii) proposed fencing to the site during the construction phase of the
development; and
(iv) approval of the Traffic Management Control Plan by the Department
of Main Roads (DMR) for any works on State controlled roads;
(b) maintenance and protection of water quality and existing drainage lines
through the construction site, through the implementation of appropriate
erosion and sediment control measures;
(c) works programme identifying key components of the works and their
respective durations;
(d) establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues;
(e) identification of complaint management procedures including:
(i) contact details for the on-site manager; and
(ii) dispute resolution procedures;
(f) details on the location of external fill sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB
any damage to the existing road system as a result of haulage operations
shall be fully repaired at the applicant’s expense; and
(g) it is acknowledged that the Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor
employed to construct the works and a final document will be required to be
submitted at the Pre-Start Meeting for the project.
Lawful Point of Discharge
7. The applicant is advised that a lawful point of discharge for the development will need
to be determined and demonstrated as part of a detailed design solution included with
the Operational Works application.
Works within a Watercourse
8. The applicant is advised that the proposal will involve works within a watercourse
which will require referral to the Department of Environment & Resource
Management under the Water Act 2000 and Sustainable Planning Act 2009 at the
time of making an application for operational works.
Qualified Person
9. For the purpose of preparing an Acid Soil and Groundwater Management Plan, a
qualified person is considered to be either:
(a) a Registered Professional Engineer of Queensland (RPEQ); or
(b) a soil scientist with a minimum of 5 years experience.
10. For the purpose of preparing a Flood Study and certifying flood levels for the
development, a qualified person is considered to be a Registered Professional
Engineer of Queensland (RPEQ) experienced in hydraulics and hydrology.
11. For the purpose of certifying acoustic treatments for the development, a qualified
person is considered to be either:
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.