Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2018-01-15 GC Agenda - Attachment 1 to Item 6 - P&E Court Appeal 344 of 2009

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

        (a)     a Registered Professional Engineer of Queensland; or
        (b)     an environmental consultant with a minimum of 3 years current experience in
                the field of acoustics.
12.     For the purpose of certifying acoustic barrier construction for the development, a
        qualified person is considered to be a Registered Professional Engineer of
        Queensland.
PROPERTY NOTES
The following property notations apply:
Property Access Driveway
For lots that have a swale/bioretention swale in their frontage (location of swale/bioretention
swale to be determined at operational works stage):
        To ensure that the integrity of the on-street drainage system is maintained, vehicle
        access to the lot must be from the constructed driveway only. The driveway must not
        be relocated without Council agreement.
Gravel road to Lot 51 and 52
That part of Hollett Road extending from the end of the seal at the eastern side of the Walter
Hay Drive culvert to the existing access track within Lot 52 is of gravel construction. Bitumen
seal may not be planned for some time, if at all.
Stormwater Quality
For Lots 4 to 13:
        This lot is provided with a stormwater quality treatment device which captures and
        stores pollutants from stormwater runoff generated on the lot. To ensure that this
        device continues to protect the quality of the wetland area, Eenie Creek and Lake
        Weyba, it needs to be routinely checked and maintained in accordance with the
        Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1).
For Lots 2, 3, 14, 15, 17, 18, 19, 26 to 33, 36 to 39 and 44 to 45:
        A roadside stormwater quality treatment device is located in the road reserve in front
        of this property. The device is designed to improve the quality of stormwater leaving
        the urban area.
Traffic Noise
For Lots 16, 20, 21 and 22:
        An Acoustic Barrier for noise attenuation is sited to the rear boundary. The
        maintenance of the acoustic barrier is the responsibility of the individual land owner.
For Lots 16, 20, 21, 22, 50 and 51:
        A Building Envelope for Noise is located within the Lot.         Acoustic building
        requirements apply for two (2) storey dwellings. Refer to Planning & Environment
        Court Appeal 344 of 2009.
Vegetation & Bushfire
For all proposed Lots affected by a building envelope:
        To ensure the safety of all future residents of the property, any dwelling on this lot is
        required by Planning & Environment Court Appeal 344 of 2009 to be constructed
        within the building envelope nominated on the approved subdivision proposal plan
        (see council file reference 152006.1999)
For proposed Lots 50, 51 and 52:
        A Vegetation Protection Covenant applies to this lot.              Refer to Planning &
        Environment Court Appeal 344 of 2009.
For all proposed Lots:

                                                                                                    16
Log in to download the original file

2018-01-15 GC Agenda - Attachment 1 to Item 6 - P&E Court Appeal 344 of 2009(PDF, 4MB).pdf · 3.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.